1.
Numerical Simulation Study on Solidify Effect of Overburden Separated Grouting;
覆岩离层注浆固化作用的数值模拟研究
2.
Similar Materials and Numerical Simulation on Injected Mining Overlying Strata
采动覆岩离层注浆的相似材料及数值模拟
3.
ELASTIC-THIN-PLATE BENDING METHOD FOR EVALUATING REDUCING-SUBSIDENCE EFFECTIVENESS BY INJECTING GROUT INTO SEPARATED STRATA IN COAL MINE
煤矿离层注浆减沉效果评价的弹性薄板法
4.
According to the experience of injecting project, the volume and the pump pressure corresponding with it are some of the most important factors.
注浆量和与其相应的泵压是覆岩离层注浆工程实施防治地表塌陷成功与否的关键参数之一。
5.
Study on the Theory and Parameters of Surface Subsidence Prediction of the Overlying Strata and Bed-Separation Under Grouting;
覆岩离层注浆条件下地表沉陷预计理论与参数研究
6.
Analysis on Ground Subsidence Control Mining Plan with Grouting in Overburden Separated Strata above Coal Pillar Under Railway Line in Tangshan Mine
唐山矿铁路煤柱覆岩离层注浆减沉开采方案分析
7.
We put forward using the technology of injecting clay grouts into separated strata to control the surface subsidence on the basis of the theory about the occurance and development.
基于岩体中离层产生、展的研究理论,提出利用“离层注浆防治地表塌陷技术”以控制地表塌陷。
8.
Study on Parameters of Water-preserved-mining Grouting Bed-separation in YuShuwan Mine YuShen Coalfield;
榆神矿区榆树湾矿保水开采注浆离层参数研究
9.
Study on Simulation Grouting Experiment in Gravel & Mechanism of Permeating Grouting;
砂卵(砾)石层模拟注浆试验及渗透注浆机理研究
10.
Reinforcing this layer by grunting mode is introduced.
介绍采用注浆方式来加固砂卵(砾)石层。
11.
A consolidating technology of pouring starch into bottom board to cut off water in coal pitJiaozuo coal industry group Fang-Zhuang coal mine;
井下煤层隔水底板注浆堵水加固技术
12.
A Study on Permeation Grouting in Gravel Layer and Application
砂砾层渗透注浆机理研究与工程应用
13.
Curtain Grouting Technique for Broken Large fault Under High Pressure and Enriched Water
高压富水破碎大断层围岩幕注浆技术
14.
Application of the grouting and reinforce technology for stopping water on tunnel through the large fault
巷道过断层注浆加固堵水技术的应用
15.
Finite element simulation on compaction grouting with bored pipe in soft soil
软土地层花管压密注浆的有限元模拟
16.
Vertical Shaft Aquifer Surface Advance Grouting Engineering Technique
立井井筒含水层地面预注浆施工技术
17.
Monitoring data analysis of soil grouting reinforcement in vertical shaft
立井井筒地层注浆加固实测数据分析
18.
Lawer Third System Red Bed Grouting in Air Shaft Ground Pregrouting in Yangcun Coal Mine
杨村煤矿风井地面预注浆工程的下第三系红层注浆