1.
balanced earthworks
填挖平衡的土方工程
2.
Confirmation of Archtecture Earthwork Project in Construction Design Elevation;
建筑土方工程施工中设计标高的确定
3.
Calculation Method of Earthwork Volume in Project of Waste Landfill Sites
垃圾填埋场工程土方工程量计算方法探讨
4.
The Engineering Simulation and Optimization of Base Construction of the Top-down Construction;
逆作工程中土方工程施工的仿真与优化
5.
To reduce earthwork costs, the volume of the fills should be equal to the volume of the cuts.
为了降低土方工程的费用,填方量应等于挖方量。
6.
The earthwork was cast up in three hours.
土方工程在三小时内就完成了。
7.
The earthwork was cast up in a few hours.
土方工程在几小时内就完成了。
8.
This project involved 400000 cubic metres of earthwork.
这项工程要挖40万土方。
9.
Research on Calculation Model of Artificial Frozen Wall in Saline Strata;
含盐土层人工冻土帷幕计算方法研究
10.
test method for evaluation of creep properties of geotextiles and grids
土工布及土工格栅的蠕变特性试验方法
11.
The teaching conception on the direction of traffic and civil engineering in the speciality of civil engineering;
土木工程专业交通土建工程方向的教学构想
12.
Construction operation specification for earthworks and explosion engineering
土方与爆破工程施工操作规程
13.
Code for construction and acceptance of earthwork and blasting engineering
土方与爆破工程施工及验收规范
14.
Discussion on Teaching Method Reform of Civil Engineering Construction Course
土木工程施工课程教学方法改革探讨
15.
The Method of Earthwork Fine Calculation of Large-scale Landscape Project
大型园林景观工程精细土方计算方法
16.
Brief talk on the influence of subgrade earthwork construction method on project cost
浅谈路基土石方施工方法对工程造价的影响
17.
Study on the Teaching Method of the Course of Civil Engineering Construction in Local Four-year-undergraduate Universities
地方本科院校《土木工程施工》教学方法研究
18.
Discussing on Teaching Methods of Geological Courses in Civil Engineering(Geotechnical Engineering);
土木工程专业(岩土工程方向)地质基础课的教学方法探讨