1.
A Brief discussion on the control of difficult point in the installation of special shape extra large caisson
异型特大沉箱安装中施工难点的控制
2.
Container Safe Convention
《集装箱安全公约》
3.
Install transmission and Transfer Case.
安装变速箱和传动箱
4.
Install the rear transmission mount.
安装后部变速箱装置。
5.
International Convention for Safe Transport of Containers
国际集装箱安全运输公约(集装箱公约)
6.
International Convention for Safe Container
国际安全集装箱公约
7.
Glove Box Remove/Install
手套箱的拆卸/安装
8.
International Convention for Safe Containers
《国际集装箱安全公约》
9.
container safety approval plate
集装箱安全认可标牌
10.
Install Timing case cover (refer to the timing case cover installation in this section).
安装正时箱盖(请参阅本节中的正时箱盖的安装)。
11.
I can't fasten the lid on this box.
我无法将箱盖安装在箱子上
12.
Analysis of whole floating installation method of caisson and box culvert
沉箱—箱涵整体浮运安装方法的分析
13.
The safe rules for handling in container port
GB11602-1989集装箱港口装卸作业安全规程
14.
The grounding wires can be fixed on case body and case door. The connecting parts can be detached.
箱体和箱门上都可安装接地线,连接件可以卸下。
15.
Glove Box Latch and Handle Remove/Install
拆卸/安装手套箱锁闩和把手
16.
collecting box [ with security provision,of base metal]
收集箱[带安全装置,贱金属制]
17.
Timing Case Cover Alignment and Seal Installation Tool 6139
正时箱盖对齐和油封安装工具6139
18.
Each succeeding fabricated box is erected on trolleys.
每段预拼的箱梁安装在小平车上。