1.
reactor service bridge
反应堆维修桥式起重机
2.
Virtual Maintenance Technology for Reactor System Based on PPR Technology
基于PPR技术的反应堆系统虚拟维修技术
3.
REPAIRING "NO RESPONSE" CCD RADIO
维修“NO RESPONSE(无反应)”CCD无线电
4.
2D Dynamic Response Analysis of Mengyejiang Concrete Faced Rockfill Dam
勐野江面板堆石坝二维动力反应分析
5.
Britain plans to encourage new reactors by amending its planning laws.
英国计划通过修改其规划法以新建核反应堆。
6.
reactor core radiation detector
反应堆堆芯辐射检测仪
7.
breeder reactor
【原物】增殖反应堆
8.
3-D Transient Coupled Sealing Analysis for the Model of Reactor Pressure Vessel;
反应堆压力容器模拟体三维瞬态耦合密封分析
9.
Performance of SiC fibers synthesized with neutron irradiation curing method
反应堆辐照不熔化法制备碳化硅纤维的性能
10.
plutonium reactor
钚反应堆, 生产钚的反应堆
11.
Canadian Deuterium-Uranium Reactor
加拿大重水铀反应堆(坎杜型反应堆)
12.
Correction Method for Critical Extrapolation of ControlRods-Rising during Physical Start-Up of Reactor with Spatial Effect
反应堆物理启动提棒外推临界时考虑空间效应的修正方法
13.
top and bottom reflected reactor
上下部反射层反应堆
14.
Elasto-plastic Seismic Response Analysis of a Long-span Hangar
大跨度维修机库弹塑性地震反应分析
15.
An approach to the inverse kinematic solution for the redundant manipulator used for nuclear reactor repairing was proposed.
给出了核反应堆检修用冗余机械手的无碰撞运动学求解方法。
16.
o8L6zylo8n;Dj J"N6Tihl"K:DaxK_z,Lyc
零功率反应堆响应函数
17.
The Development of 3-D Transient Sealing Analysis Program System for the New Type Reactor Pressure Vessel;
新型反应堆压力容器三维瞬态密封分析程序系统研制
18.
Numerical Simulation of Three-Dimensional Flow Through Full Passage and Performance Prediction of Nuclear Reactor Coolant Pump
核反应堆冷却剂循环泵全流道三维数值模拟及性能预估