说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 句库 -> 电厂调试
1.
Exploring key-point of NPP commissioning management based on analysis of events from NPP commissioning practice in China
从国内核电厂调试事件实例探讨调试管理要点
2.
Debugging Experiment of 670t/h Pulverized Fired Boiler in Huanggezhuang Power Plant;
黄桷庄电厂670t/h煤粉炉调试试验研究
3.
Discussion on Optimal Dispatch of Hydropower Stations in Local Power Network
试论地区电网水电厂的优化调度问题
4.
The Adjustment and Optimization of 330MW Boiler Operation of Zhongning Power Plant;
中宁电厂330MW锅炉运行调试与优化
5.
Process Management and Research of the Wind Power Plant Equipment Debugging Process
风力发电厂设备调试过程管理与研究
6.
Parameter Test and Field Examination Method for Hydro-turbine Governor System Model
水电厂调速系统建模参数测试与现场试验方法
7.
Dynamic simulation test of PAC-4000A auto voltage control system for power plant
PAC-4000A发电厂自动电压调控系统动态模拟试验
8.
Coordinating Test for Combustion Optimization of Boiler No.1 in India Yamunanagar Power Plant
印度雅慕那电厂1号锅炉的燃烧优化调整试验
9.
Commissioning Practice and Analysis of Huaneng Yuhuan Power Plant Brushless Exciting System
华能玉环电厂无刷励磁系统的调试实践和分析
10.
The Principle and Debugging of Plasma Ignition Firebox of LingWu Power Plant
灵武电厂等离子点火燃烧器原理及调试
11.
Maintenance of Equipment and System during Installation and Commission of Nuclear Power Plants
核电厂安装和调试期间设备和系统的维护保养
12.
Discussion of Problems on Commissioning Process of Flue Gas desufurization System in Erdos Power Plant
鄂尔多斯电厂湿法烟气脱硫调试存在问题探讨
13.
Primary Frequency Regulation Test of Generator Units of Tianshengqiao Hydropower Station
天生桥水力发电总厂机组一次调频试验
14.
The retrofit and commissioning of double adjustable swirling flow burner of boiler NO1 in Huanneng Nantong Power Plant is introduced .
介绍了华能南通电厂#1锅炉双调风燃烧器的改造与调试情况。
15.
Mechanical Ventilation (Air Conditioning) Model Experiment of Longtan Hydropower Station s Underground Houses;
龙滩地下水电站全厂机械通风(空调)模型试验研究
16.
Fu Xin Jin Shan Thermal Plant Generator-transformer Unit Protective Relay Setting, Debugging and Microcomputer Protection Implement;
阜新金山电厂发变组保护整定、调试及微机保护实现
17.
Control on Schedule and Quality during Engineering Regulation Process for Tuoketuo Power Plant, Phase II;
大唐托克托电厂二期工程调试过程中工期和质量的控制
18.
TEST STUDY ON COMBUSTION ADJUSTMENT OF BOILER FOR SUPERCRITICAL 600MW UNIT IN YANGZHOU POWER PLANT
扬州电厂超临界600MW机组锅炉燃烧调整的试验研究