1.
As you turn the knob in direction B, the stroke will be decreased.
向B的方向转动,则行程量变小。
2.
Changing the stroke of thread take-up spring 1
挑线弹簧1的行程量调整
3.
The act of measuring or the process of being measured.
量,测量,度量测量过程或行为
4.
The Research on the Administrative Procedure s Control to the Administrative Exertion;
行政程序控制行政自由裁量权的研究
5.
Administrative Justice: Procedural Control on Power of Administrative Discretion;
行政正当:对行政裁量权的程序控制
6.
Running environment for carrying out engineering quantity list bidding;
浅谈推行工程量清单招标的运行环境
7.
The Positive Engineering Quality Behavior is the Assurance of Engineering Entity Quality;
正向工程质量行为是工程实体质量的保证
8.
The Quality record shall be filled in accordance with Quality Record Control Procedure.
质量记录填写按《质量记录控制程序》执行。
9.
SG1 The project is quatitatively managed using quality and process-performance objectives.
用质量和过程性能目标对项目进行量化管理。
10.
Quality Planning and Executive Force of Program Files in Quality Management;
质量管理中的质量策划和程序文件的执行力
11.
A Comparative Study of Variable Data Control Charts for Measuring the Software Process Action;
度量软件过程行为变量数据控制图的比较研究
12.
Data Printout/Record for Application Programs
在执行应用程序时,对测量数值的记录
13.
Familiar with metallurgical products and QA/ QC procedure.
熟悉冶金行业产品及质量控制流程。
14.
It was used by 48 000 vehicles daily in1997. The toll was $3.
年内每日行车量48000架次,每程收费3元。
15.
A METHOD FOR QUANTITATIVELY ANALYSING OF THE STROKE USING PUMP CARD
利用泵功图进行冲程定量分析的方法
16.
We drew out the journey as much as we could but we still arrived early.
我们尽量拉长行程,但仍然提早到达。
17.
Analysis of Modularize-construction and Running Quality of High-quality Course;
精品课程的模块建设与运行质量分析
18.
The Problems in and Countermeasures for the Standardized Pricing by Quantities Bill;
工程量清单计价执行中的问题及对策