1.
Study on Reason and Modification Technique of Neutral Displacing Voltage of 35kV System in Daqing Oil Field
大庆油田35kV系统中性点位移电压成因及改进技术研究
2.
Laboratory Study of Characteristic Testing for Piezoelectric Ceramic Micropositioning
压电陶瓷微位移器特性测试实验研究
3.
Sensorless BLDC Drive Allowing for Neutral Point Voltage
计及中性点电压的无刷直流电机无位置传感器控制
4.
Improvement of Overvoltage Protection of 110kV Transformer Neutral Point
110kV变压器中性点过电压保护的完善
5.
Research on the Output Characteristic of Piezoelectric Micro-displacement Actuator;
压电陶瓷微位移驱动器输出特性的研究
6.
Measurement and nonlinear correction for micro-displacement of piezoceramic tube
压电陶瓷管的微位移测量与非线性校正
7.
Three Optimizations for the Robust of Cemtral Point Voltage of OTL Electric Circuit;
OTL电路中点电压稳定性三次择优
8.
The potential energy of a unit charge at any point in an electric circuit measured with respect to a specified reference point in the circuit or to ground;voltage.
电势,电位相对于电路中某一特定参照点或地面的属于电路中任何一点的单位电荷势能;电压
9.
Research on neutral-point potential balancing and control method for three-level NPC inverter
三电平中点箝位型逆变器中点电压平衡和控制方法研究
10.
Electromagnetic Emulation and Analysis of the Differential Transformer Displacement Sensor
差动变压器式电磁位移传感器的电磁性能仿真与分析
11.
Appalication of Small Reactor Connected to Neutral of 500kV Transformer
500kV变压器中性点串接小电抗器的应用
12.
A Neutral-point Potential Balancing Algorithm for Three-level Single-phase NPC Converters
中性点箝位型三电平单相逆变器中性点电位平衡控制方法
13.
Study of Transient Voltage Responses at Neutral Point of Transformers with a Surge Incoming from Winding Terminal
变压器首端进波中性点暂态电压响应的研究
14.
Studay Over-Voltage on Neutral Grounding via Small Reactor of High-Voltage Transformers;
采用小电抗接地的高压变压器中性点过电压的研究
15.
"The work done in moving a unit charge from one point to another, as in an electric circuit, is equal to the difference in potential energies at each point. "
将单位电荷从一点移到另一点(如在电路中)所做的功即等于两点之间的位能差。
16.
Research on Neutral Point Floating of Three-level Inverter;
三电平高压变频器电容中点电位平衡问题的研究
17.
Experimental study of the correlation between ICP and shift of cerebral midline in early stage of postdecompressive brain bulk enlargement
减压后脑肿大早期颅内压和脑中线移位相关性的实验研究
18.
Power system neutral1 grounding is usually done by means of transformer and generator neutrals.
电力系统中性点通常通过变压器和发电机的中性点来接地的。