1.
Longitudinal contraction deformation:The component contracts in the weld direction after weiding.
纵向收缩变形:构件焊后在焊缝方向上发生的收缩。
2.
Effects of dobutamine stress test on the systolic longitudinal myocardial Doppler velocity
多巴酚丁胺负荷试验对心肌纵向收缩功能的影响
3.
Evaluation of Left Ventricular Long-Axis Systolic Function in Patients with Cardiomyopathy Using Doppler Tissue Imaging
组织多普勒评价心肌病患儿左室纵向收缩功能的研究
4.
Evaluation of left ventricular systolic function with tissue Doppler imaging in patients with type 2 diabetes
组织多普勒成像评价2型糖尿病患者左心室纵向收缩功能
5.
A Study of the Correlation between Left Ventricular Systolic Strain in Longitudinal, Radial and Circumferential Directions and Left Ventricular Ejection Fraction in Normal Subjects
正常左室纵向、径向和周向收缩应变与左室射血分数的相关研究
6.
longitudinal length extension vibration mode
纵向长度伸缩振动模式
7.
Development of Magnetostrictive Transmitter and Receiver for Exciting Ultrasonic Longitudinal Guided Waves in Steel Strands
钢绞线中激励纵向模态的磁致伸缩型激励及接收器的选型
8.
Assessment of systolic synchrony and longitudinal movement of left ventricle in hypertrophic cardiomyopathy using tissue tracking
组织追踪法评价肥厚型心肌病左室收缩协调性和纵向运动功能
9.
Split Vertical In:13:03:Split:Vertical In
左右向中部收缩:13:03:收缩:左右向中部
10.
Split Horizontal In:13:01:Split:Horizontal In
上下向中部收缩:13:01:收缩:上下向中部
11.
Compression bag, with3 vertical compression straps.
压缩袋,通过3根纵向织带压缩睡袋的包装体积。
12.
the alkaline inclination of the local waters; fabric with a tendency to shrink.
纤维有收缩性的倾向。
13.
The maximum available compression, thanks to both vertical and horizontal straps.
压缩袋,可从横向和纵向最大限度压缩睡袋的包装体积。
14.
Control handle up, gear retracting door open.
操纵手柄向上,起落架收上时舱门打开。
15.
Polypropylene (PP)pipes--Determination of longitudinal reversion
GB/T6671.3-1986聚丙烯(pp)管材纵向回缩率的测定
16.
Polyethylene (PE)pipes--Determination of longitudinal reversio
GB/T6671.2-1986聚乙烯(pe)管材纵向回缩率的测定
17.
Unplasticized polyvinyl chloride (PVC) pipes--Determination of longitudinal reversion
GB/T6671.1-1986硬聚氯乙烯(PVC)管材纵向回缩率的测定
18.
Discussion on layout of temperature slots of the main power building longitudinal frame with 1000MW units
1000MW机组主厂房结构纵向温度伸缩缝设置的探讨