1.
Date-Time display options (date-time picture switch)
日期-时间显示选项(日期-时间显示开关)
2.
!!Returns the current date and time formatted as a date and time.!
!!返回日期时间格式的当前日期和时间。!
3.
Time/date information log notes the time of day and date of the recording.
时间/日期信息日志债券的日期及时间一天录制.
4.
The end date or time is set to occur before the start date or time. Please change either the start date and time or the end date and time.
完成日期或时间应该发生在开始日期或时间之前,请修改完成日期和时间或开始日期和时间。
5.
near that time or date.
接近那个时间或者日期。
6.
Resetting the data and time
日期和时间的重新选择
7.
Time, date, and place for bid opening.
开标日期:时间:地点:
8.
The Timeline finish date must be later than the start date.
时间线完成日期必须在开始日期之后。
9.
The Period from date must be earlier than the To date.
时间段的起始日期必须早于结束日期。
10.
This field requires both a date and time. Enter a date.
该字段要求日期和时间。请输入日期。
11.
The start date and time are after the end date and time.
开始日期和时间在结束日期和时间之后。
12.
Time/ date information log notes the time of day and date of the recording.
时间/期信息日志债券的日期及时间一天录制.
13.
The hour and day from which a time period begins shall not be counted as within the time period.
期间开始的时和日不算在期间以内。
14.
The hour and the day from which a time period begins shall not be counted as within the time period.
期间开始的时和日,不计算在期间内。
15.
The period is computed in hours, days, months and years. The hour and the day from which the period begins are not included therein.
期间以时、日、月、年计算。期间开始的时和日,不计算在期间内。
16.
Please enter a valid Interval start date (within the Timeline start and finish dates).
请输入有效的间隔开始日期(在时间线开始日期和完成日期范围内)。
17.
Please enter a valid Interval finshi date (within the Timeline start and finish dates).
请输入有效的间隔完成日期(在时间线开始日期和完成日期范围内)。
18.
Calendar Event report: Start date, Start time, End date, End time, Subject, Location, Label
日历事件报告: 开始日期、开始时间、结束日期、结束时间、主题、地点、标签