说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 句库 -> 下伏基岩
1.
STUDY OF CONDUCTED WATER TRACER OF INTERSECTING FAULT OF LOWER BEDROCK OF EARTH-ROCKFILL DAM
土石坝下伏基岩交错断层导水示踪研究
2.
Study on the Roof Stability of Concealed Karst Cave under Pile Foundation Loading in Karst Areas;
岩溶区桩基荷载下隐伏溶洞顶板稳定性研究
3.
The Stability Analysis of Cavern under the Pile Foundation of Bridge in Karst Area;
岩溶地区大桥桩基下伏溶洞稳定性研究
4.
Interaction between karst-subsidence foundation and subgrade in Lou-Xing freeway and its treatment methods
娄新高速公路下伏岩溶塌陷与路基相互作用及治理措施
5.
Channels are incised by streams into the underlying red siltstones.
古河道由水流切割而侵入下伏的红色粉砂岩中。
6.
Analysis of Stability of Cave Roof under Pile Tip in Karst Area
岩溶区桩端下伏溶洞顶板稳定性分析研究
7.
Study on seismic reflection wave field characteristics of formations below igneous rock
火成岩下伏地层地震反射波场特征研究
8.
Application of Ground-Penetrating Radar in Detecting Hidden Karst under Pier
探地雷达在探测墩下隐伏岩溶中的应用
9.
NUMERICAL SIMULATION OF ROCK DEFORMATION AND SEEPAGE FIELD WITH A FULLY-WATER KARSTIC COLLAPSE COLUMN UNDER MINING INFLUENCE
采动影响下强充水型隐伏岩溶陷落柱围岩变形与渗流场数值模拟
10.
Exploration conditions of buried magnetite-quartzite type iron deposit covered by Mesozoic strata in Zhangbaiwan,Hebei Province
河北张百湾中生代盖层下隐伏磁铁石英岩型铁矿床的勘查条件
11.
So Israel put men secretly all round Gibeah to make a surprise attack on it.
以色列人在基比亚的四围设下伏兵。
12.
And Israel set men in ambush all around Gibeah.
29以色列人在基比亚的四围设下伏兵。
13.
To rise and fall in turn, as waves.
起伏如海浪般上下起伏
14.
The material source of the Carboniferous karst type bauxite in North China mainly came from the underlying Late Cambrian-Middle Ordovician carbonate rock.
华北石炭纪岩溶型铝土矿的主要物质来源为下伏的晚寒武世—中奥陶世碳酸盐岩。
15.
The lower zone and the bronzite of the transition zone may be compared with the basal zone of the still-water complex.
下岩带和过渡带的古铜辉岩可与斯蒂尔沃特杂岩的基底岩带相比。
16.
Dim Small Target Detection in Strong Undulant Clutter Background Based on Adaptive Filter
基于自适应滤波的强起伏背景下弱小目标检测
17.
So Israel set men in ambush around Gibeah.
士20:29以色列人在基比亚的四围、设下伏兵。
18.
Numerical Simulation of Residual Subsidence in an Underlying Mining Goaf Area of Capital Construction Site
基建场地下伏采空区剩余沉降量的数值模拟