1.
pack-to-formation median grain size ratio
充填物与地层砂粒度中值比
2.
median pack-to-formaton grainsize ratio
充填砾石与地层砂粒度中值比
3.
formation-to-gravel size ratio
地层砂与砾石粒度比
4.
gravelsand filled perforation tunnel
被砾石与地层砂混合物充填的射孔孔道
5.
gravel to sand size ratio
砾石-地层砂粒度比
6.
partially sand packed perforation
地层砂部分充填的炮眼
7.
gravel-to-sand median diameter ratio
砾石-地层砂直径中值比
8.
sand-packed tube displacement
砂粒填充管驱替试验
9.
Sequence Stratigraphic Analysis and the Evolution of the Mesozoic Basin in Jiyang Depression;
济阳坳陷中生代盆地充填演化与层序地层分析
10.
Study on Influence of Sulphide in Tailings on Quality of Backfill
尾砂中硫化物对充填体质量影响研究
11.
Bored Pile Foundation Reinforcement Technology in Tunnel Silt-filled Caverns
隧道粉砂层充填溶腔钻孔桩地基加固施工技术
12.
It is recommended that flat pieces of corrugated fiberboard be used between contents and peanuts to help prevent migration through the peanuts.
建议在内容物与填充颗粒之间使用平的瓦楞纤维板,以防止物品在填充颗粒中移动。
13.
granular insulation
松散颗粒填充隔热层
14.
To reduce the filling cost, various cement sand ratios are used at different heights for the tailings consolidated filling body in Anqing Copper Mine.
为了降低充填成本,安庆铜矿尾砂胶结充填体在不同的高度采用了不同的灰砂比。
15.
Sequence Filling and New Tethys Evolution of Qum Formation,Central Iran Basin
中伊朗盆地库姆组层序充填与新特提斯海演化
16.
0 - Clip (Default);1 - Isometric;2 - Stretch
-剪裁(默认值);1-等比填充;2-变比填充
17.
This channel is filled with cross-bedded sandstone.
该河边充填着具交错层理的砂岩。
18.
DEVONIAN SEQUENCE FILLING RESPONSE TO THE EVOLUTION OF THE YOUJIANG BASIN
泥盆纪右江盆地演化与层序充填响应