1.
Supervise completion inspection & testing, clearly mark out connection points with serial numbers.
监督竣工检查和测试,清楚地编号标注系统连接点.
2.
When the engineer performs inspection, it is usually to determine that the structure, as completed, conforms to the plans and specs( specific ations).
工程师进行检查时,通常是确定建筑物在竣工时是否符合图纸和施工说明书。
3.
Investigation Methods for Ecological Environment Impact During Completed Acceptance of Expressways
高速公路竣工环保验收生态环境影响调查方法
4.
ENVIRONMENTAL IMPACT INVESTIGATION OF WATER CONSERVANCY ENGINEERING AT FINAL ACCEPTANCE(Ⅰ)──THEORY
水利工程竣工验收环境影响调查分析(Ⅰ)——一般理论
5.
Review on methods of Environmental Protection Check for the Completed Hydropower Project and its application
水电工程竣工环境保护验收调查技术方法与实践
6.
The mechanical completion check list of the unit has been approved by both of the Buyer's and Seler's representative.
这个装置的机械竣工检验表已由买方和卖方的代表审定。
7.
Study on Energy Efficiency Evaluation for Residential Buildings in Shenzhen;
深圳市居住建筑节能竣工验收检测与评价的研究
8.
Precise Setting Out and Finish Construction Survey of the Swimming Pool in Hefei Olympic Sports Center
合肥市奥体中心游泳比赛池精密放样与竣工检测
9.
Analysis of the EIA effectiveness for highway noise from the environmental protecting acceptance check
从竣工环境保护验收调查分析公路噪声环评的有效性
10.
Preparation of Investigation Program and Report of Acceptance Check in terms of Environmental Protection for Completed Construction Projects
建设项目竣工环境保护验收调查方案和报告的编制
11.
Study on Preparing the Report of Environmental Protection Acceptance Check for Oilfield Productivity Exploitation Construction Projects;
浅谈油田产能开发建设项目竣工环境保护验收调查报告的编制
12.
Discussion on the Problems in Environmental Protection Acceptance of Monitoring and Investigation for Construction Projects
建设项目竣工环保验收监测与调查中的问题探讨
13.
when the project is completed,
在三峡工程完全竣工前,
14.
final accounts of the completed capital constructionproject
基本建设工程竣工决算
15.
The project had been completed by the end of 1990 .
这项工程于1990年底竣工。
16.
check and acceptance of the completed capitalconstruction project
基本建设工程竣工验收
17.
On completion accounts and accounts record of constructional project
浅谈建设工程竣工结算与竣工结算备案
18.
floor space of buildings completed by real estate enterprise was 17.074 million square meters.
竣工面积1707.4万平方米。