Still be applicable to the river embankment the protection, coast to manage, and the assisting of tunnel engineering and breakwater establish the etc.
还适用于江河堤坝防护,海岸治理,隧道工程及防波导流坝的辅设等。
2.
Hydraulic Optimization in Overflow of Cofferdam and Dam in River Divertion during Construction;
施工导流中围堰及坝体过流水力优化计算
3.
Flow Surface Construction at the Bottom in No.2 Diversion Tunnel of Double Arch Dam of Xiaowan Hydropower Station
小湾双曲拱坝2号导流底孔底板过流面施工
4.
Seepage might cause leakage, piping effect, landslide and even endanger the whole dam.
堤坝的渗流会导致渗漏、管涌、滑坡甚至危及整个大坝的安全。
5.
Three Gorges Right Bank First-stage River Diversion Concrete Dam Body Joint Grouting
三峡右岸一期导流工程混凝土坝体接缝灌浆
6.
Study on Simulation and Optimization for the Construction Diversion Process of Xiangjiaba Hydropower Station;
向家坝水电站施工导流过程仿真与优化研究
7.
Dynamic Visualization Construction Diversion of XiangJiaBa Hydroplant;
向家坝水电站施工导流动态可视化研究
8.
Study on Mechanism and Effect of Flow Control and Aggradation for Permeable Pile Dike;
透水桩坝工程导流落淤效果和机理试验研究
9.
On diversion and drainage scheme of construction of Daliuta area rubber dam project
大柳塔小区橡胶坝工程施工导流及排水方案
10.
The vaporize, condense, overflow and guide plate inner are made in stainless steel.
蒸发锅、冷凝管、溢流坝和内部导流板都用不锈钢制成。
11.
According to Guo, the height of the dam on the left bank of the Three Gorges will reach 185 meters this year, and the damming of the diversion channel will be completed in November.
郭主任介绍说,三峡左岸大坝今年达185米高程,10月导流明渠截流。
12.
Study on the Hydraulic Characteristic for Constructing Diversion Tunnels of High Dam Transformed into Spillway Tunnels in a Type of Rotating Flow Shaft
高坝施工导流洞改建为旋流竖井式泄洪洞的水力特性研究
13.
Study on Concrete Face Rockfill Dam Construction Diversion Standard and Flood Passing Measures During Construction Period;
混凝土面板堆石坝施工导流标准及施工期渡汛措施研究
14.
Stability analysis on high slope at inlet of No.1 diversion tunnel for initial stage of construction of Changheba Hydropower Station
长河坝水电站1~#初期导流洞进口高边坡稳定分析
15.
Use of Whole Circle Steel Form Carrier in Concrete Construction in Diversion Tunnel at Gomal Zam Dam Project
全圆针梁台车在高摩赞大坝枢纽工程导流洞混凝土施工中的应用
16.
FEM CALCULATION OF HIGH INLET SLOPE OF DIVERSION TUNNEL ON RIGHT BANK OF CHANGHEBA HYDROPOWER STATION
长河坝水电站右岸导流隧洞进口高边坡稳定性有限元计算分析
17.
The Design of the Diversion Plan of the Construction of Concrete Face Rock-fill Dam(CFRD)of Wujiazhuang Reservoir
吴家庄水库混凝土面板堆石坝施工导流方案设计
18.
Evaluating hydrologic alternation along the East River basin,southern China,under the changing environment