1.
The Concrete Continuous Box Girder Top Surface Flatness Control
混凝土现浇连续箱梁顶面平整度控制研究
2.
In general, the top surface of the beam is acted upon by transverse loads.
横向载荷作用一般认为在梁的顶面上。
3.
Study on cable-beam support technology of big section area roof board with weathering and flabbiness character
大断面风化顶板锚梁喷支护技术的试验研究
4.
Basically, a composite concrete deck consists of a concrete top slab, flanked on each side by concrete main beams, and a concrete middle beam.
组合混凝土梁的基本构成是顶部为混凝土平面,两侧为混凝土主梁,中间为混凝土中梁。
5.
At the lower end of each roof slope, eaves purlins are provided over the ceiling joists.
屋面两坡的下方,檐口的连系梁支承在平顶搁栅之上。
6.
Raise vehicle at body rails.
在车体横梁处顶高车辆。
7.
The timber carries the whole weight of the roof.
栋梁支撑屋顶全重。
8.
support(a roof,bridge,etc)with trusses(truss )
用构架支撑(屋顶、桥梁等).
9.
Erect steel columns, beams, and joist - 3rd floor and roof
架设钢柱、梁和托梁:三层和楼顶
10.
connecting the crossbeam to the apex of a triangular truss.
连接大梁和三角孔桁梁顶点的支柱。
11.
Discussion on the influence of crack between top and web of 30m T beam on beam
浅析30m T梁顶腹板间裂纹对梁的影响
12.
A floor or roof beam placed between two long beams that supports the ends of the tailpieces.
顶梁,楣放大两根长梁之间用来支撑半端梁尾部的一块地板或尾梁
13.
Application of Simultaneous Ascending Technology with Super thin Jack During Bridge Reconstruction
超薄千斤顶整体同步顶升桥梁技术的应用
14.
Stringer cross section dimensions
纵梁断面尺寸(mm)
15.
Application Research on Replacing Bridge Seat by Rising Whole Girder Board Synchronously;
整体同步顶升梁板更换桥梁支座的应用研究
16.
The Research on Construction Control in the Incremental Launching of Main Girder of Cable-stayed Bridge with Steel Box Girder
钢箱梁斜拉桥主梁顶推法施工阶段控制研究
17.
Construction Technology of Replacing Bridge Bearers and Integral Jacking up Beam Slab
桥梁支座更换及梁板整体顶升施工技术
18.
Jack-up,Pan Reset Scheme and Construction Craft of Bridge Beams
桥梁梁体顶升、平移复位维修方案及施工工艺