说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 句库 -> 混凝土桩基础
1.
The Study of the Ultrasonic Wave Applied in the Nondestructive Test of the Concrete Pile;
超声波在混凝土桩基础无损检测中的应用研究
2.
Study on Pile Cap Cracks of Mass Concrete
大体积混凝土桩基础承台裂缝控制研究
3.
Research on Frozen and Uplift Resistant for Concrete Short Pile Foundation in Seasonal Frozen Soil Area
季节性冻土环境下混凝土短桩基础抗冻拔研究
4.
Analysis of Temperature Stress in Super-Length Concrete Structure with the Pile Foundation;
桩基基础超长混凝土结构的温度应力分析
5.
In general, concrete foundation is almost in dry and wet alternate area while the conerete pile is in liquid phase area.
通常混凝土基础多处于干湿交替带,混凝土桩多处于液相带。
6.
The concrete pouring construction of deep water piles foundation of Ziyang Hanjiang super large Bridge
紫阳汉江特大桥深水桩基础混凝土灌注施工
7.
The Application of the Foundation Process Based on Prestressing Force High Intensity Concrete Tubular Pile
预应力高强混凝土管桩在基础处理中的应用
8.
Comparing standards between China and foreign countries on durability of spun concrete pile
混凝土管桩基础耐久性的中外标准规范比较
9.
The Applicant of Reinforced Concrete Rotary-dig Drill Caisson Pile in Large-equipment Foundations
钢筋混凝土旋挖钻孔灌注长桩在大型设备基础中的应用
10.
Common Problems and Treatment on Underwater Concrete Construction with Bored Caisson Pile Foundation
钻孔灌注桩基础水下混凝土施工常见问题及处理
11.
PROCESSING TECHNOLOGY ON LIGHTWEIGHT STRUCTURE OF FROST-RESISTANT UPLIFT FOR CONCRETE SHORT PILE FOUNDATIONIN COLD ENVIRONMENT AREAS
高寒环境下轻体结构混凝土短桩基础抗冻拔处理技术
12.
Note of Studying the Provincial Standard《Technical Specification for Pretensioned Spun Concrete Pile Foundation》DBJ13-86-2007
省标《先张法预应力混凝土管桩基础技术规程》DBJ13-86-2007学习札记
13.
Influence of the Soft Foundation on Reinforced Concrete Forked-Pilesand Caps
软土地基对钢筋混凝土叉桩与桩帽的影响
14.
On technical regulation for DBJ 04-273-2009 prestressed concrete pile foundation
DBJ 04-273-2009预应力混凝土管桩建筑桩基技术规程
15.
Supervision and Monitoring of Low-strength Concrete Piles Composite Foundation
低强度混凝土桩复合地基的施工监理
16.
If a good base cannot be found at a reasonable depth, then a so-called deep foundation must be provided. This usually comprises a series of driven or cast-in-situ reinforced concrete piles.
若在合理的深度内找不到坚实的地基层,那就要采用深基础,如通常采用的钢筋混凝土桩基
17.
Application of Vibration Cast-in-place Concrete Thin-walled Pipe Pile to Mollisol Ground
振动沉模现浇混凝土薄壁管桩处理软土地基
18.
Study on Concrete Pile of Compaction Forming in Subsea Soil
海底土中挤压成型混凝土桩基技术研究