1.
idle time to utilization of time
闲置时间和划用时间百分比
2.
The percent of processor time that is not spent idle. This value is approximate.
处理器处于非闲置状态的时间百分比。该值为近似值。
3.
None;Start Date;End Date;Duration;Resource;Percent Complete
无;开始日期;结束日期;持续时间;资源;完成百分比
4.
Percent of work complete: Resources report the percent of work complete, between 0 and 100%.
工时完成百分比:承担任务的资源可以在0和100%之间报告完成工时的百分比。
5.
% Work Complete, Actual Work, Comments, Finish, Name, Remaining Work, Start, Work
工时完成百分比, 实际工时, 批注, 完成时间, 名称, 剩余工时, 开始时间, 工时
6.
100% Stacked Line. Displays the trend of the percentage each value contributes over time or categories
百分比堆积折线图。显示每一数值所占百分比随时间或类别而变化的趋势线
7.
100% Stacked Area. Displays the trend of the percentage each value contributes over time or categories.
百分比堆积面积图。显示每一数值所占百分比随时间或类别而变化的趋势线。
8.
The overhead rate can be expressed as a percent-age or an hourly rate.
间接费用分配率可以用百分比或小时费率来表示。
9.
The percent of non empty sets of notifications that are retrieved by the notification service every sample time.
在每个采样时间内,通知服务获取的非空通知集合的百分比。
10.
the percentage of all rental units (as in hotels) are occupied or rented at a given time.
被占用的租赁单位或在给定时间占有租赁物的百分比。
11.
the percentage of all rental units (as in hotels) that are unoccupied or not rented at a given time.
在给定时间内未被占用的或未租用单位所占百分比。
12.
Note: The definition can be defined by the user either by the number of minute(s) viewed or percentage of the time band viewed.
注意:用户可根据收看的最小分钟数或收看时间在整个时段中的最小百分比来自行定义。
13.
The number of percentage must be between 1 and 100.
百分比数字必须介于1和100之间。
14.
Maximum size of Recycle Bin (percent of drive)
回收站的最大空间(驱动器的百分比)
15.
A division of the playing time of a game.
分场比赛时间的划分
16.
Emissions were to be reduced by a specified percentage below what they would be in the absence of technological control measures;
要求污染物的排放降到特定的百分比,这个百分比要低于没有技术控制措施时的百分比。
17.
Displays the percentage of your disk that has been checked for bad sectors.
显示检查坏扇区时已检查的百分比。
18.
Maximum percentage variation of the estimate of man-hour costs.
工时成本估计最大增减百分比。