说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 句库 -> 主配电
1.
Switch Rooms: A room containing the main electrical switchboard.
开关转换室: 装有主配电盘的房间
2.
Distribution Circuit Breaker A distribution circuit breaker is a device used for overload and short current protection of loads connected to a main distribution device.
配电线路开关配电线路开关是给连接在主配电设备上的负荷提供过载和短路保护的装置。
3.
Yes, and there can also be the power interchange between shore supply and ship supply.
是的。主配电板中也可进行岸电和船电的切换和控制。
4.
main motor switchboard
主推进电动机配电盘
5.
STUDY ON MAIN CIRCUIT OF POWER QUALITY COMPENSATOR IN DISTRIBUTED SYSTEM
配电系统电能质量补偿装置主电路的研究
6.
a new method to optimize the sectional switches on main feeder of the distribution network
配电网主馈线分段开关优化配置的新方法
7.
Research on the Function of the Distribution Automation Master Station System
城市配电网自动化主站系统功能研究
8.
A Summary of High-capacity Hydro-turbine Generator Main Protection Allocation Scheme
大型水力发电机主保护配置方案综述
9.
Interference fit level for electricity spindle on superfine cellulosine disintegrator
超细木粉粉碎机电主轴的过盈配合量
10.
Research of Power Distribution Network Automation Communication System Based on Medium Voltage Power Line (Host Station);
基于中压配电线的配电自动化通信系统的研究(主站系统)
11.
General Electric Company is the leading manufacturer of industrial switchboards.
通用电气公司是主要的工业配电盘生产厂家。
12.
Distribution Strategy of Bidding Capacity Based on Joint Analysis on Generation Power Market;
发电侧基于主辅联合分析的竞价电能分配方法
13.
The String Configuration Rule and Strategy in 500kV Station of Henan Power Grid
河南电网500kV变电站主接线配串策略研究
14.
Design of Automatic Test System for Electrical Power Distribution Equipment of Unmanned Aerial Vehicle
无人机电气配电主控制盒自动测试系统的研制
15.
Causes of the Energy Losses in the Distribution Network and the Major Countermeasures to Decrease Losses
配电网电能损耗的原因与主要降损措施
16.
Main breakers provide overcurrent protection and a single disconnect point for all power in a switchboard or device.
主开关能够提供过电流保护,是配电盘或设备的电源断开点。
17.
It is mainly introduced the protection configuration and the concerted relationship for the power supply system of Shenzhen metro vehicles at the 1(superscript st) stage.
主要介绍了深圳地铁一期工程牵引供电系统保护配置及配合关系。
18.
adapter is the start-up video adapter that is active upon power-up.
主适配器是指上电时活动的起始视频卡。