1.
Structural Characteristics, Installation and Test of 800 kV GIL for Laxiwa Hydropower Station
拉西瓦水电站800 kV GIL结构特点及安装试验
2.
"Erection, Test Runs, Commissioning, Performance Test and Acceptance"
安装、试车、投料试生产、性能测试和验收
3.
Safety valve test and safety valve testing bed
安全阀试验规定及其试验装置的分析与研究
4.
Safety device testing for emergency diesel generator.
应急柴油发电机的安全装置试验。
5.
test, manufacture, produce, stockpile, install or deploy nuclear weapons
试验、制造、生产、储存、安装或部署核武器
6.
Be responsible for the new energy equipments; adjust to try, check and acceptance.
负责能源设备的安装、调试和验收工作。
7.
Construction,Installation and Commissioning Experiences for 900 MW Units;
900MW机组的施工、安装和调试经验
8.
Test on Incorrectly Installed Stress Cone of Prefabricated Cable Terminal
预制式电缆终端应力锥安装错位试验
9.
a test rig
试车装置, 试验台
10.
Test of Driver Safety Protection Structure for Wheel Loader Cab
轮式装载机驾驶室司机安全保护结构试验(1)
11.
Numerical Simulation and Experiment Study on Launch Safety of Gun Propellant Charge;
火炮发射装药发射安全性数值仿真与试验研究
12.
<Abstract>Practice of ISO CRP Test;
国际标准“儿童安全包装”试验的实际应用
13.
Theoretical Basis of ISO CRP Test;
国际标准“儿童安全包装”试验的理论根据
14.
Experimental Research on the Technology for Installation and Replacing Simple Supported-Continuous Girder Bridge Bearing
简支转连续梁桥支座安装与更换技术试验研究
15.
Installation of Rotating Speed and Torgue Sensor for Pump/Motor Test Stand
泵/马达试验台转矩转速传感器安装方法分析
16.
Design on Bulldozing Blade Mounted on Multifunctional Test Bench for Construction Machinery
工程机械多功能试验台推土板安装设计研究
17.
Experimental Research on Safety Protection of Chamber Blasting Charging in High-temperature Chamber
硐室爆破时高温硐室装药的安全防护试验研究
18.
The Designing of Experimental Program and Safety Analysis on Double-stack Container Cars with Deviation of Gravity Center
双层集装箱重心偏移装载试验方案设计及运行安全性研究