说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 句库 -> 开航日期
1.
Cable steamer name sailing date
请电告船名及开航日期
2.
Lc126 folding chair please cable name vessel date sail enable cover insurance
第126号信用证项下的折椅装船后请即电告船名及开航日期,以便我方保险。
3.
The ship was to sail about the 15th of last month, without convoy.
该船原订于上个月15日开航,没有护航。
4.
Receive Location '{0}' has Start Date later than the Stop Date. Change either the Start Date or the Stop Date.
接收位置“{0}”的开始日期晚于停止日期。请更改开始日期或停止日期。
5.
Tested steering gear defore sailing ,condition normal.
(航海日志)开航前实验操舵设备,情况正常。
6.
The harbour superintendency administration is required to notify the health and quarantine organ at the earliest possible time of the fixed date and time of departure of the exit vessel( s).
港务监督机关应当将船舶确定开航的日期和时间尽早通知卫生检疫机关。
7.
Displays current date and time in navigation pane.
* 当前的日期和时间会在导航条中显示。
8.
The date range fixed from date is after the to date
日期范围的固定开始日期晚于完成日期
9.
may I cancel my May 29 Flight and leave the flight date open?
我可以取消5月29日的航班,并更改日期吗?
10.
The boat set sail on July 5, headed directly for Annapolis.
船7月5日开航,直驶安纳波里斯。
11.
We'll bring the date of the meeting forward from the 20th to the 18th.
我们要把开会日期从20日提前到18日。
12.
The date of the meeting was advanced from the 10th to the 3rd of June.
开会日期从6月10日提前到6月3日。
13.
The date of the meeting was advanced from the 1 0 th to the 3 rd of June .
开会日期从六月十日提前到六月三日。
14.
The Timeline finish date must be later than the start date.
时间线完成日期必须在开始日期之后。
15.
The ending date must be set later than the starting date.
结束日期必须要设得比开始日期晚。
16.
'From' Date must be earlier than 'To' Date.
“开始”日期必须早于“结束”日期。
17.
Start date cannot be set later than the Finish date.
开始日期不能设置为晚于完成日期
18.
The schedule's Start Date cannot be before it's End Date.
调度的开始日期不能早于结束日期。