说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 句库 -> 深海钻探计划
1.
International Deep Sea Drilling Project/Ocean Drilling Programme
国际深海钻探计划/大洋钻探计划
2.
Introduction to the Integrated Ocean Drilling Program 323 Performing on the Bering Sea
国际综合大洋钻探计划IODP323白令海航次介绍
3.
Design and Realization of the Monitoring System in Deep-Sea Drilling Machine
深海中深孔钻机监控系统设计与实现
4.
offshore drilling
海底钻探;海上钻井;海上钻探;海洋钻井;海洋钻探;近海钻探;滨外钻探
5.
deepwater drilling
深水钻进、深海钻进
6.
This diagnosis has since been confirmed by deep-sea drilling.
这种特征后来为深海钻探所证实。
7.
Great Wall Drilling Company Overseas Business Tax Planning Measures
长城钻探公司海外业务税收筹划对策
8.
Exploration programmes are based on drilling for the stratiform deposits along projections of established trends.
勘探计划依靠钻探,钻探层状矿床沿着已知走向的延伸部分进行。
9.
Men are now also drilling the cold, deep North Sea.
现在人们在寒冷的深海上也在进行钻探。
10.
Difficulties and countermeasures of gas hydrates coring drilling of marine deep water
深海天然气水合物钻探取心的难点与对策
11.
Design and Construction of Marine Boring Platforms for Foundations Resting in Uncovered Rock in Deep Water
海上深水裸岩基础钻孔平台设计与施工
12.
HIGH TEMPERATURE HIGH PRESSURE ULTRA-DEEP WELL DRILLING FLUID DENSITY DESIGN METHOD
高温高压超深井钻井液密度设计方法探讨
13.
Drilling Fluid Technology for MPD in Moderate and Deep Well in Binhai Oilfield.DFCF,
滨海油田中深层控压钻井钻井液技术
14.
offshore drilling platform
海上钻井平台近海钻探平台
15.
Site 782A (ODP,Leg125)lies on the eastern margin of the Izu Bonin forearc basin,about halfway between the active volcanic arc and the Izu Bonin trench in the western Pacific Ocean. The borehole 782A,476 8 m deep,was fully cored and described.
大洋钻探工程”125航次的782A钻孔位于西太平洋菲律宾海东北部,井深476.8m。
16.
Analysis on Deepwater Subsea MudLift Drilling System and Design of Rotating Diverter;
深水海底泥浆举升钻井系统分析及旋转分隔器设计
17.
Calculation method of rig hook load on deepwater drilling platform
深水钻井平台钻机大钩载荷计算方法
18.
offshore mobile drilling rig
移动式海上钻探设备