说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 句库 -> 压载吃水
1.
Part of the bottom structure of F.P tank should be strengthened against slamming at the draught of normal ballast condition according to rules requirements.
根据规范要求,应在正常压载吃水情况下对艏尖舱底部区域做拍击加强。
2.
draft full load
满载吃水满载吃水装载量
3.
main ballast tank
主压载舱主压载舱主压载水舱
4.
maximum loaded draft
最深满载吃水〔深度〕
5.
A ship draws more water when it is loaded than when it is empty.
载货的船,吃水深过空船。
6.
bilge and ballast piping system
舱底水和压载水系统
7.
bilge and ballast general service pump
舱底水和压载水通用泵
8.
oily ballast water separator
压载水油水分离装置
9.
2.make automatic loading plan basing on the weight of cargo and planning draft & trim;
2.根据装货量及吃水、吃水差要求进行自动配载;
10.
inspection of draft mark and loaded water lines
吃水标尺和载重水线测定
11.
ballast-stripping eductor
压载及洗舱水排泄器
12.
ballast bilge water treatment system
压载油污水处理系统
13.
bilge and ballast oily water separator
舱底水和压载水油水分离器
14.
Please mark the safety draft scale and fore and aft full draft of the vessel in the stowage plan.
请在积载图上标明本船的确安全水尺和满载后的前后吃水。
15.
hold water ballast
下水柜或下舱装水的压载
16.
bilge and ballast piping arrangement
舱底水和压载水管系布置图
17.
Ship's name, port of registry, draft marks and loadline marks to be dressed and repainted.
船名,船籍港,吃水标志和载重线标志需修饰,重刷。
18.
It is 42m long and 11m wide. Its full-load draught is 1.2m, while full-load displacement is 130 tonnes. It can carry 306 passengers a time.
有42米长,11米宽,满载吃水为1.2米,满载排水量为130吨,一次可运载306名旅客。