说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 句库 -> 三角堰
1.
These shortcomings will be avoided by use of the immersed perforated outlet pipe to replace the V-weir effectively.
淹没式穿孔集水管出水方式则可以有效避免三角堰出水的许多缺点,有效提高出水水质。
2.
Benevolence Everlasting as a River--On "Qimen Sanyan Barrage" and Its Benefit to Later Generations;
万古恩同万古流——论“七门三堰”及“三堰余泽”
3.
Study on the Proposal of the Third Stage RCC Arch Cofferdam for Three Gorges Project;
三峡三期碾压混凝土拱围堰方案研究
4.
Three Dimensional Finite Element Analysis on Stress and Deformation of Cofferdam and Cut-off Walls of Shenxigou Hydropower Station
深溪沟水电站围堰堰体及防渗墙应力变形三维有限元分析
5.
Considerate the Construction of Water Culture in the Dujiangyan Regions from the Anthropology Angle;
从人类学角度看都江堰地区水文化建设
6.
Study on Sustainable Utilization of Water Resources and Application of 3D Simulation in Dujiangyan
都江堰水资源可持续利用及三维虚拟仿真研究
7.
Research on Technology of Underwater Blasting Compaction for TGP?s High Soil Rock Cofferdam
三峡高土石围堰水下爆炸压实技术研究
8.
The Electric Capacity Benefit of the Three Gorges Hydropower Stationat Water Storage Level 135 m in the Situation of Cofferdam;
三峡电站蓄水位135m围堰发电的容量效益
9.
Research and application of some key technologies for the cofferdams of Three Gorges project
三峡工程围堰若干关键技术研究与实践
10.
On Installation & Construction Technology for Songpu Bridge Ⅲ with Anticollision Steel Box Cofferdam
松浦三桥防撞钢套箱围堰安装施工技术
11.
Excavations at Three Archaeological Sites in Pankou Hydropower Station in Shiyan City,Hubei
湖北十堰潘口水电站三处古遗址的发掘
12.
3D numerical simulation of overtopping flow field for earth-rockfill cofferdam of Silin hydropower station
思林水电站土石围堰过水流场三维数值模拟
13.
Three-dimensional finite element analysis of planthouse tail water thin-plate weir in construction period
施工期厂房尾水薄壁堰三维非线性有限元分析
14.
Application of modified D-P model to analysis of the second stage cofferdam in Three Gorges Project
修正D-P模型在三峡二期围堰分析中的应用
15.
New Construction Techniques for Dam Foundation Grouting and Anti-seepage Cofferdam of Three Gorges Project
三峡工程坝基灌浆与围堰防渗施工新技术
16.
Comprehensive construction technology for the open channel clos ure and the third stage of earth-rock cofferdam at Three Gorges Project
三峡明渠截流与三期土石围堰工程综合施工技术
17.
Hydration Heat Calculation of Fly Ash in RCC for 3rd Phase Cofferdam of Three Gorges Project
三峡三期围堰碾压混凝土中粉煤灰水化热计算研究
18.
An Initial Exploration to the Principle of Proportionality of Sentencing
量刑比例初探——以江苏省姜堰市人民法院《规范量刑指导意见》为视角