说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 句库 -> 预计造价
1.
New models of the dynamic patterns of carbon uptake by forest ecosystems allow improvements in the estn. of the costs of carbon sequestration in the U.S.
由森林生态系统摄入的新型动态碳有望减少美国进行吸收碳的预计造价
2.
The Construction Cost Research on Bill of Quantities-based Valuation Norms;
工程量清单计价模式下的工程造价研究与预测
3.
On the Cost Control in High Strength PHC Pile Foundation Design;
高强度预应力砼管桩设计造价控制浅析
4.
The Study of Controlling Engineering Cost Through the Construction Drawing Budget and Engineering Volume List Valuation;
采用施工图预算和工程量清单计价控制工程造价的研究
5.
Controlling Project Cost by Combining Construction Drawing Budget of Party A with Quantity List Accounting Cost;
采用甲方施工图预算和工程量清单计价相结合的办法控制工程造价
6.
two-rate two-part prepayment meter
双价率两部电度预付计
7.
The cost of the building amounts to 10000 yuan.
这屋的造价合计一万元。
8.
Method of Remanufacturability Index Forecasting during Equipment Design
装备设计中的再制造性指标预计方法
9.
Many contractors will overestimate the costs in order to hedge against unforeseen problems that may arise during construction.
很多承包商将过高估计造价,以防备在施工期间可能发生的不可预见的问题。
10.
Construction,assembly and cost analysis of bridging machine for large span prestressed box girder erection;
大跨度预应力箱梁架桥机构造拼装与造价分析
11.
Study of manufacture, erection and cost of 40m pre-stressed concrete simple box girders for railways;
铁路40m预应力简支箱梁制造架设与造价分析
12.
Effectiveness of Nursing Intervention among Patients with Colostomy by Enterostomal Therapist
造口治疗师对肠造口患者护理干预的效果评价
13.
Pre-Evaluation of Management Consultation for Computer Integrated Manufacturing System Project in Manufacturing Enterprises;
制造企业CIMS工程项目管理咨询预评价
14.
Control the discussion of the fabrication cost of the project by working drawing budget
采用施工图预算控制工程造价的探讨
15.
Prediction and Management of Influence of Material Price Increase on Highway Cost
材料价格上涨对公路造价影响的预测和对策
16.
The Theory and Demonstration Research of Cost Calculation Gist and Cost Calculation Mode;
工程造价计价模式的理论与实证研究
17.
Relation Research on Value Chain,Value Creation with Management Accounting;
价值链、价值创造与管理会计关系研究
18.
The Pre-controling of Project Cost in B.B.Q Model;
清单计价模式下工程造价的事前控制