1.
Monitoring and Test Technique in East Sea Area Ground Treatment of Xiamen
厦门环东海域填海造地工程监测与检测技术
2.
Research on the Utilization of Marine Spatial Resource of Macao--The Project of Reclaiming Land from the Sea;
澳门海洋空间资源利用研究——澳门的填海造地工程
3.
Foundation of Sea Reclamation Project in Beibu Gulf of Guananxi and the Construction Method
广西北部湾填海造陆工程地基基础及施工方法
4.
Study on the Method of Backfill in Coastal Reclamation Project of Tianjin Lingang Industrial Area;
天津临港产业区围海造陆工程吹填法研究
5.
Study on the Process of Xiamen City Sea Reclamation Based on Remote Sensing Image
基于遥感影像的厦门市填海造地的进程研究
6.
prefabricated band drain [reclamation works]
预制的排水带〔填海工程〕
7.
Central and Wan Chai Reclamation
中环及湾仔填海工程
8.
Research on the Design Scheme of Hydraulic Sandfill Engineering of LongXue Shipbuilding Base;
广州龙穴造船基地围堤吹填工程设计方案研究
9.
Application of vacuum-preloading in a large-area land reclamation engineering
真空预压在大面积吹填造地工程的应用
10.
Introduction to plan for sea filling and ground treatment of Ningde Nuclear Power Plant
宁德核电厂填海工程及地基处理方案介绍
11.
Discussion on Reclamation of the Rights of Using the Sea and Final Acceptance
填海造地海域使用确权及竣工验收若干问题的探讨
12.
Maritime engineering design in the project of Offshore Oil Engineering (Qingdao) Co., Ltd.
中国海洋石油工程青岛海工建造基地工程设计及地基处理研究
13.
Study on the Tsuen Wan Bay Further Reclamation
荃湾海湾进一步填海工程研究
14.
Case Study on the Impacts Assessment of Reclamation on Marine Environment
填海工程海洋环境影响评价实例研究
15.
Construction Practice of Jet-grouting Pile Water-proof Curtain in Sea Reclamation Region
填海造陆区旋喷桩止水帷幕施工实践
16.
Points of safety supervision for sea reclamation engineering
浅谈围海造地工程施工安全监理工作要点
17.
The District Open Space at Belcher Bay Reclamation as part of the project was completed in August 1998.
卑路乍湾填海区的地区游憩用地建筑工程已于一九九八年八月完成,这是工程计划的一部分。
18.
Wan Chai Reclamation Phase 2 is under planning.
湾仔填海工程第II期仍在规划中。