1.
STUDY ON SEDIMENTATION CHARACTERISTICS AND STRENGTH DISTRIBUTION OF FILL IN DRIFT CUT AND FILL MINING
巷道式充填法回采进路充填体沉积特征及强度分布规律研究
2.
Obliteration of Empty Sella for Therapy of Empty Sella Syndrome by Transsphenoidal and Transfromal Approach
经蝶窦和额进路充填法治疗空蝶鞍综合症
3.
Study on the vibration effect of roof in the downward stope drifts of cemented backfill process of Wushan copper mine
武山铜矿下向进路充填采矿法采场顶板爆破震动效应研究
4.
PRACTICE OF UPWARDS DRIFT HDRAULIC FILL MINING IN WUSHAN COPPER MINE
武山铜矿上向进路水砂充填采矿法生产实践
5.
Experiment and Application of Cemented Undercut and Fill Stoping with Hexagon High-access
下向六角形高进路胶结充填采矿法试验与应用
6.
The indoor experiment on the filling materials used for downward slicing drift mining with cemented bacKfill in Gaolong Gold Mine was performed.
对高龙金矿下向分层进路胶结充填采矿法所用的充填材料进行了室内试验研究。
7.
down-ward progression of gravel
砾石逐渐向下充填推进
8.
Practice of Pre-setting Laneway in Underhand Drift Cut-and-Fill Stoping
下向进路式胶结充填采矿法中巷道预留技术实践
9.
Study on Technology of Large Access Upward Horizontal Layer Cut and Fill Stoping with Hydrualic Props Roof Supporting
水压支柱护顶大进路上向水平分层充填采矿工艺技术研究
10.
Paths can be used for drawing, filling, and clipping.
路径可以被用于绘图,填充和剪裁。
11.
Research on grouting filling material experiment in the goaf under highway
公路下采空区注浆充填材料试验研究
12.
The formation reasons and filling behaviors of the beads in top injection and side injection were analyzed.
对两种射料充填形态的形成原因和充填特性进行了分析和比较。
13.
Progress of research of pastes containing calcium hydroxide allies
氢氧化钙类根管充填材料的研究进展
14.
Thurston Algorithm and Evolutionary Strategy One for Circle Packings;
圆填充的Thurston与进化策略算法
15.
Research Progress of Carbon-filled Electromagnetic Shielding Composites
碳系填充型电磁屏蔽材料的研究进展
16.
An Improved OAEP 3-Round Padding Scheme
一种改进的三轮OAEP明文填充方案
17.
Compiling of the Supplementary Norm for Cost of Compaction of High-Grade Highway Embankment Filled with Stone;
高等级公路填石路堤压实费用补充定额的编制
18.
Filling Path Optimization of FDM System for Fuse Extrusion
熔丝挤出快速成型系统的填充路径优化