1.
Practice on Arrival at No.3 Blast Furnace Full Capacity with Medium Maintenance and Blow-in of Baotou Steel
包钢3~#高炉中修开炉快速达产实践
2.
Practice of Cooling and Heating up No.10 Stove Relining
五号高炉10#热风炉在线中修凉炉、烘炉实践
3.
Investigation on damage of No.2 BF of Baotou Steel in the intermediate repair of 1998
包钢2~#高炉1998年中修炉体破损调查报告
4.
Analysis on Monolithic Stability of Huge Blast Furnace in General Overhauling
大型高炉大修过程中整体稳定性分析
5.
Pratice of Blow-in for Xuangang No.7 BF
宣钢7号高炉大修停炉开炉达产操作
6.
Practice of Hard Indenting Patching Material Applied to 2156m~3 Blast Furnace
硬质压入修补料在2516m~3高炉中的应用实践
7.
The determine process of the overhaul cycle of blast furnace is a typical fuzzy event.
高炉大修周期判定中,等级的划分属于典型的模糊事件。
8.
In this article, a comprehensive evaluation method of fuzzy math used in the overhaul cycle of blast furnace is introduced.
本文用模糊数学中的综合评判法来评定高炉大修周期。
9.
The Application of Risk Identification Methods in the Repair Job of Dry Gas Cleaning in Blast Furnace
风险识别技术在莱钢高炉煤气干法除尘检修中的应用
10.
PRACTICE OF RAPIDLY REACHING PRODUCTION RATE AFTER OVERHAULING OF 2000m~3 BLAST FURNACE
邯钢2000m~3高炉大修开炉快速达产达效生产实践
11.
PRACTICE OF BLOWING-ON AND REACHING DESIGNED CAPACITY AFTER EXTENSIVE REPAIRING ON NO.6 BF IN ANGANG STEEL
安钢6~#高炉大修后开炉及达产操作实践
12.
Maintenance Practice for Blast Furnace Equipment Based on RCM Theory;
基于RCM的高炉设备维修工程与实例
13.
Computer Control System Design of No.4 Blast Furnace in Chongqing Iron & Steel Co., Ltd.
重钢4#高炉易地大修计算机控制系统
14.
Application of Construction Schedule Control of Civil Construction Project in Converter Maintenance;
土建项目施工进度控制在转炉炉修中的应用
15.
Applications of SVM to Predict Silicon Content in Hot Metal;
支持向量机在高炉炉温预报中的应用
16.
Study on Treating Blast Furnace Slag by TYNA Granulation Process;
中型高炉图拉法炉渣处理工艺的研究
17.
The Application and Research of Intelligent Control about Temperature Predict Inside Blast Furnace;
智能控制在高炉炉温预测中应用研究
18.
Application of DCS in Gas-fired Boiler
DCS系统在8#高炉锅炉设计中的应用