1.
Three-dimensional Stability Analysis on Pillar Wall Rocks for Different Mining Scheme
不同采矿方案顶柱围岩三维稳定性分析
2.
The Study of Mining Method the Water Body for South 2 Mining Area;
大平矿南二采区水体下开采方案研究
3.
A Plan for Mining of Complicated Gold Lode in Northern Area of Ying Gezhuang Mine
英格庄北矿区难采金矿脉开采方案研究
4.
Power Supply Plan for Thin-layers in Fully-mechanized Mining
煤矿井下薄煤层综采工作面供电方案
5.
The research on simulation experimental scheme of heave compensation in deep sea mining
深海采矿升沉补偿模拟试验方案研究
6.
THE HIGH BENCH LONG HOLE MINING IN ANQING UNDERGROUND COPPER MINE
安庆铜矿高阶段大直径深孔采矿法实施方案
7.
Investigation of the Structure Schemes and Optimization in Deep Mining Stopes of Tonglushan Mine;
铜绿山矿深部矿床采场结构方案及优化研究
8.
Optimization of the Development Transport Plan for Capacity Expansion Transformation at Ekou Iron Mine
峨口铁矿采矿扩能改造开拓运输方案的优化
9.
The Design and Study of Mining Method under the Village for Aiyou Mine 106 Mining Area;
艾友矿106采区村庄下开采方案的设计研究
10.
Study on Disposal Optimizing Project of Underground Gob Area of Metal Mine;
金属矿山地下采空区处理方案的优化研究
11.
Analysis on the Stability of Stope and Study on the Supporting Method in Yuhuasi Iron Mine;
余华寺矿区采场稳定性分析及支护方案研究
12.
Numerical Simulation of High Ground Stress Metal Mine Mining and Supporting Scheme
高地应力金属矿山开采及支护方案的数值模拟
13.
Study on High Efficient Mining Scheme for Xiaowanggou Iron Mine to Transfer from Open-Pit into Underground Mining
小汪沟铁矿露天转地下高效开采方案研究
14.
Optimization of Schemes for Western Mining Boundary in Wulongquan Limestone Mine
乌龙泉石灰石矿西区开采境界方案优化研究
15.
Analysis and Comparison of Two Design Schemes on No.12 District in No.2 Mine of Yangquan Coal Group
阳煤二矿十二采区设计方案比较与分析
16.
Resolution to Corner Coal Exploitation Scheme of Aged Coal Mine
衰老矿井边角呆滞煤开采方案设计研究
17.
Schematic design of full trackless underground mining of Aigedzor copper-moly ore
艾格佐尔铜钼矿全无轨地下开采方案设计
18.
Mining Protective Coal Seam Scheme and Effect Forecast in Sanjiaohe Mine of Taiyuan Iron and Steel Complex
太钢三交矿井开采保护层方案和效果预测