1.
A STYDT ON FILLING TECHNOLOGY FOR LARGE STOPE IN ANQING COPPER MINE
安庆铜矿高大采场充填工艺技术研究
2.
Analysis on the Stability of Fill of Extra Large Stopes in Anqing Copper Mine
安庆铜矿特大型采场充填体稳定性分析
3.
Choice of stope matting material for dry type back-filling mining method
干式充填采矿法采场铺垫材料的选择
4.
Disposal method for wall compression in waste lifting stoping
削壁充填采矿法采场内压帮的处理方法
5.
Study with Numerical Simulation and Field Actual Measurement on Mining with Backstowing Roadway of Xingdong Mine;
邢东矿充填巷式开采数值模拟与现场实测研究
6.
Stability Analysis of Winning Track's top Tray of upper to Lamination Consolidated Fill
上向分层胶结充填采场顶板稳定性分析
7.
Analysis of filling effect and filling ratio of backfill mining in longwall face
长壁工作面充填开采的充填比与充填效应分析
8.
Study on the vibration effect of roof in the downward stope drifts of cemented backfill process of Wushan copper mine
武山铜矿下向进路充填采矿法采场顶板爆破震动效应研究
9.
Research on the Optimization of Structural Parameters for Heavy Ore-body by Sublevel Open-Stope with Subsequent Filling
厚大矿体分段空场嗣后充填采场结构参数优化研究
10.
rill cut and fill method
倾斜分层充填采煤法
11.
square set and back filling method
方框支架充填采矿法
12.
horizontal cut and fill stoping
水平分层充填采矿法
13.
flat back cut and fill method
水平分层充填开采法
14.
Application Foreground of Open Stoping Afterwards Back -filling Mining Method in Metallic Mines
空场嗣后充填采矿方法在黑色金属矿山的应用前景
15.
Discussion about relation between the rate of supporting pit roof and supporting effect of backfilling mass
坑采充填接顶率与充填体承载效果关系探讨
16.
overhand cut and fill
上行分层采掘充填开采法
17.
MINING PLAN AT DEPTH OF BAGUAMIAO GOLD DEPOSIT IN SHAANXI PROVINCE--Discussion on filling treatment of goaf of mullock heaps and tailings by means of open-stope method
陕西八卦庙金矿床深部开采方案——空场采矿法废石尾砂空区充填处理的讨论
18.
STUDY ON STOPING SEQUENCE FOR MULTI-STEP MINING SYSTEM WITH BACK
多步骤回采的充填采矿法回采顺序研究