1.
The reformation and strategies put forward for the synthetic ammonia system
合成氨造气工段水系统改造效果分析
2.
recreate an idea, mood, atmosphere, etc. as by artistic means.
通过艺术手段重新创造出情绪气氛等。
3.
The Structural Features in the Middle of Longmen Mountain and the Discussion on Exploration Prospect
龙门山中段构造特征及油气前景探讨
4.
Structural Features in the Northern Segment of Longmen Mountains and the Discussion on Its Hydrocarbon Prospects
龙门山北段构造特征及油气前景探讨
5.
THE STRUCTURAL PATTERN AND OIL-GAS EXPLORATION DIRECTION OF NORTHEN SECTION OF LONGMEN MOUNTAIN
龙门山北段构造模式及油气勘探方向
6.
Discussion on Tapping the Potential Shallowly-Bedded Natural Gas in the Western Section of the Ziliujing Structure
自流井构造西段浅层天然气挖潜探讨
7.
Strenthen the visa management of struction phase,control the cost of project;
加强施工阶段签证管理 控制工程造价
8.
How to control the project cost in the engineering design stages
工程设计阶段如何进行工程造价控制
9.
impulse moulding machine of three working positions
三工位气流冲击造型机
10.
The brief analysis design stage is one of project construction cost control main stages;
浅析设计阶段是工程造价控制的主要阶段之一
11.
the complete paralysis of industry caused by the electricians' strike
电气工人罢工造成的工业完全瘫痪.
12.
Influence of Variation Order during the Construction Stage on Construction Cost;
施工阶段工程变更签证对工程造价的影响
13.
Measures to engineering cost control work well in construction stage;
如何做好施工阶段工程造价的控制工作
14.
Some Keypoints in Controlling Construction Cost at the Bidding Stage of Quantity List Evaluation;
工程量清单招投标阶段工程造价控制工作重点
15.
Management of project cost under mode of project quantity list in construction process
工程量清单模式下施工阶段的工程造价管理
16.
An instrument or a method for inflicting such pain.
刑具造成这种痛苦的工具或手段
17.
Invite bidding and bid system is effective measure to control engineering cost
招投标制是控制工程造价的有效手段
18.
Design and Implement of Automatic Control System of Pelletizing Workshop;
造球工段自动控制系统的设计与实现