说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 句库 -> 竖井掘进
1.
This paper briefly intro-duced the practice of longhole blast shaft-formirg method for blind shaft sinking in Tongshan Copper Mine.
本文简要介绍了深孔爆破成井法在铜山铜矿盲竖井掘进中的实践。
2.
multi-level outlet shaft spillway
多层进水竖井式溢洪道
3.
This method has the advantages of no need of dismantling the cutterhead at heading face place, no need of setting up vertical shaft or operation corridor, less construction difficulty, quick reparation and low cost.
该方法无需在掘进面拆解刀盘、建竖井或工作廊道,施工难度小,修复速度快,费用低。
4.
long hole raising
深孔爆破法天井掘进
5.
The shaft of a mine.
竖坑矿的矿井或竖井
6.
access shaft [aviation fuel receiving facility]
进出竖井〔飞机燃料接收设施〕
7.
The air flows down to a shaft and thus loses potential energy.
空气向下进入竖井,因而失去势能。
8.
Quick Roadway Excavation with Hoisting by Air-return Shaft
利用进回风立井改绞实现矿井快速掘进
9.
Numerical Simulation on the Vertical Pipe intake of Pumped Storage Plants;
抽水蓄能电站竖井式进/出水口数值模拟
10.
Study on Hydraulic Characteristics of the Vertical Pipe Intake of Pumped Storage Plants
抽水蓄能电站竖井式进水口水力特性研究
11.
Numerical Simulation of Level Swirling Flow of Inner Energy Dissipation Discharge Tunnel with Shaft Inlet
竖井进流水平旋转内消能泄洪洞的数值模拟
12.
Experimental Research on the Inlet of Shaft Spillway in Lower Reservoir of the Pumped Storage Power Stations in Qingyuan
清远抽蓄电站竖井泄洪洞进口试验研究
13.
Computer application in mechanized slope tunneling
计算机在斜井机械化掘进中的应用
14.
Industry Test of Roadheader in Coal Mines
EBZ-160型掘进机井下工业性实验
15.
Study on the maximal driving length of dummy drift in uranium mines
铀矿井独头巷道最大掘进长度的研究
16.
REVIEW ON THE TUNNELLING TECHNIQUES APPLIED IN THE ACCESS-DAM HIGHWAY OF JINGGANGCHONG HYDROPOWER STATION,JINGGANGSHAN CITY
井岗山市井岗冲水电站进坝公路隧道掘进技术成果述评
17.
Shape Optimization of Vertical Pipe Inlet/Outlet and Research of Y-type Tube in Pumped-Storage Plant;
抽水蓄能电站竖井式进/出水口体型优化与“卜”型岔管研究
18.
Model Test and Numerical Simulation for Swirling Flow of Inner Dissipator with Shaft Inlet;
竖井进流水平旋转内消能泄洪洞试验研究与数值模拟