1.
Testing and Operation of Nuclear Air-Cleaning Systems in Qinshan NPP
秦山核电厂核空气净化系统试验与运行
2.
QNPP STEAM GENERATOR TUBE RUPTURE ACCIDENT ANALYSIS
秦山核电厂蒸汽发生器传热管破裂事故分析
3.
Optimization of technical renovation project management in QNPP
浅议秦山核电厂技术改造项目管理之优化
4.
Discussion on Restoring the MFW after Event and Reducing the CDF of QNPP
浅论秦山核电厂事故后恢复主给水运行降低堆熔频率
5.
Application of Nuclear Safety Principle for Reactor Protection System in QinShan Phase II NPP Extension Project
秦山核电厂二期扩建工程反应堆保护系统设计中核安全原则的应用
6.
A New Technology of Nuclear Emergency Electronic Accountibility System
秦山第三核电厂核应急电子清点系统
7.
The Research about Countermeasures for the Sea Water Pipe Corrosion of Nucear Power Plants in Qinshan;
秦山地区核电厂海水系统管道防腐对策研究
8.
The Study of Secondary Water Chemistry Problem for Qinshan Ⅱ NPP;
秦山第二核电厂二回路水质问题及对策研究
9.
Study on the Anti-Inadvertent-Dilution Modification in Qinshan Phase Ⅱ Nuclear Power Plant;
秦山第二核电厂防硼误稀释事故改造研究
10.
The Optimization of Start-Up Physics Tests of Qinshan Nuclear Power Plant Phase II;
秦山第二核电厂物理启动试验优化探讨
11.
Exploration and Practice of Performance Management of Qinshan Phase Ⅲ NPP Operators;
秦山第三核电厂运行人员绩效管理探索与实践
12.
Preliminary Study on Outage Cycle Extension of Qinshan CANDU NPP
秦山CANDU核电厂大修周期延长的初步研究
13.
MODIFICATION OF DRAIN MODE IN HIGH-PRESSURE STEAM CONDUCTING PIPE TO STEAM TURBINES OF QINSHAN NUCLEAR POWER PLANT NO.3
秦山第三核电厂汽轮机高压导汽管疏水改进
14.
The Advanced Strategic Study of Fuel Management for 4×650MW Units of Qinshan Nuclear Power Plant Phase Ⅱ;
秦山第二核电厂4×650MW核电机组先进燃料管理策略研究
15.
Preliminary Study on Improving In?CoreFuel Management Strategy ofGNPS and QNP
秦山和大亚湾核电厂堆芯燃料管理策略改进的初步探讨
16.
Digital Design and Reliability Analysis for Qinshan Phase-I Reactor Power Control System
秦山一期核电厂反应堆棒控棒位系统的数字化设计及其可靠性
17.
Application Technology of Profiled Steel Sheet Formwork for 3MX Main Plant in Phase Ⅱ Enlarge Project of Qinshan Nuclear Station
秦山核电站二扩工程3MX主厂房压型钢模板应用技术
18.
Enlargement Upgrading and Reform of Qinshan Nuclear Power Plant Ⅱ Computer Network Monitoring System