1.
Design-limited can efficiently control cost of building.
限额设计可以有效地控制工程造价。
2.
Quota Design Is Effective Measure Of Controlling Engine ering Cost;
控制工程造价的有效手段—限额设计
3.
Study on Application of Rationed Design in EPC Project
限额设计在EPC项目中的应用研究
4.
A Study on the Application of Limitation Design on Cost Control of Project
工程限额设计与控制工程投资的关系
5.
Application of Quota Design of Cost Control in Engineering Design Stage;
限额设计在工程设计阶段费用控制中的应用
6.
The Importence of the Strategic Pass to Move Ahead in Appraisal--To Discuss About Quota Design;
应重视评审关口前移——关于限额设计的探讨
7.
APPLICATION OF QUOTA DESIGN IN THE INVESTMENT CONTROL OF CONSTRUCTION PROJECT;
试析限额设计在工程项目投资控制中的应用
8.
Study of investment control of speed increase with a closed-end fund design for existing railways;
既有线提速限额设计下的投资控制研究
9.
Discussion on limited design implementing in EPC general contract project
浅谈限额设计在EPC总承包项目中的实施
10.
Sustainable Design Based on LCC and Its Improvement on Quota Design;
基于LCC的建筑可持续设计及其对限额设计模式的改善
11.
Discussion on Distributing Method of Limiting Design Total Value in In-vestment Control during Design Period;
设计阶段投资控制中限额设计总值分配方法的探讨
12.
The cost control of HLSIP shoud take a method of quota design step by step during the design stage;
高扬程梯级提水灌溉工程的投资控制,在设计阶段应逐步推行限额设计的作法;
13.
Under the scheme, these insolvency practitioners' remuneration would be subsidised by the government funds up to a prescribed limit.
根据该项计划,这些破产从业员的酬金由公帑资助,但设有订明限额。
14.
The Excellent Design and Evaluation of Labor Ration in the JiLinQingFeng Cameical Fiber CO. Ltd;
吉林奇峰化纤股份有限公司劳动定额的优化设计与评价
15.
Design of real-time monitoring systems for status and stability limits of stable generator tripping devices
实时稳定切机装置状态及稳定限额监控系统设计
16.
aggregate limit
(配额的) 总限额
17.
NAMS ceiling [notional annual mid-point salary ceiling]
按薪级中点估计的年薪值限额
18.
The SPDC is responsible for projects with investment surpassing the set ceiling.
其中限额以上的项目由国家计委负责。