1.
Analysis on Mechanical Behavior of Steel Crane Girder System Used for Multi-fuction Crane with Guide Wheel
带导向轮复杂吊车车间钢吊车梁体系的受力性能分析
2.
Construction of rock abuttal for bridge crane in an underground pumped storage power plant
“广蓄”电站地下厂房岩壁吊车梁施工
3.
THE DESIGN AND ANALYSIS ON CRANE GIRDER WITH 23.4 m SPAN
23·4m跨度吊车梁的设计与分析
4.
Has Guide Wheel's Multi-purpose Crane Steel Crane Beam's Design and the Procedure Realizes
带导向轮的多功能吊车钢吊车梁的设计与程序实现
5.
The Analysis of Steel Bar’s Fatigue Reliability of Reinforced Concrete Crane?beams
钢筋混凝土吊车梁钢筋疲劳可靠度分析
6.
The Study on the Investigating and Strengthening of Crack of the Upper Part of Welded Steel Crane-girder
钢吊车梁上部区域裂缝的调查及加固的研究
7.
Formation and Development of the Cracks in the Upper Part of Welded Steel Crane Girders
焊接钢吊车梁上部区域裂缝的形成与发展
8.
Study on Fatigue Reliability and Safety Control of Steel Structure Crane in Service;
在役钢结构吊车梁疲劳可靠性与安全控制研究
9.
The Analysis of Portal Frame Column by the Crane Beam s Partiality Influence Outside the Plane;
吊车梁平面外偏心对门式刚架柱的影响分析
10.
The Fatigue Behaviour of Crane RC Beams Strengthed by CFRP;
CFRP加固钢筋砼吊车梁抗弯疲劳性能研究
11.
Study for Checkout and Prestress Strengthening of the Steel Crane Girder;
钢吊车梁的校核分析及预应力加固研究
12.
Numerical Analysis of Rock Bolt Crane Girder for Underground House of Hydro-power Plant;
水电站地下厂房岩锚吊车梁结构数值分析
13.
Crane Beam and Frame Column Design of a Heavy Steel Structure Plant
某重型钢结构厂房的吊车梁与排架柱结构设计
14.
Manufacturing Technique of Super-large Crane Beam for TISC 3,500 mm Plate Rolling Mill
天钢3500mm中厚板工程超大型吊车梁制作技术
15.
Construction technology of large-tonnage pre-tensioned pre-stressing crane beam in construction site
施工现场大吨位先张法预应力吊车梁施工技术
16.
DISCUSSION ON SOME QUESTIONS IN CALCULATION OF PLUG-IN CRANE BEAM WITH VARIABLE SECTIONS
突变式插板吊车梁计算过程中一些问题的探讨
17.
Field Measurement and Acceptance of Crane Beam Installation in Fengman Dam
丰满大坝主厂房吊车梁安装现场实测验收
18.
And it can be used for designing composite I-beam and I-typed crane beam.
这对工程上组合梁及吊车梁的设计具有实际意义。