1.
A DISCUSSION ON COKE DEPOSITION IN FURNACE TUBES OF DELAYED COKING UNIT
延迟焦化加热炉炉管内结焦问题的探讨
2.
INSTALL WATER HEATING MEDIA SYSTEM TO INCREASE HEAT EFFICIENCY OF COKING HEATER
增设水热媒系统 回收焦化加热炉烟气余热
3.
The working condition of coking furnace was severe.
焦化加热炉的工作条件较苛刻,炉管内的结焦难以避免。
4.
The Cast Plug Return Bend Leakage Season Analysis for Delayed Coker Heater and Improvement Measure
焦化加热炉回弯头泄漏原因分析及解决措施
5.
Optimizing tube furnace operation to improve delayed-coking unit handling capacity;
优化加热炉操作,扩大焦化装置处理量
6.
Research and Application of Excellent Cascade Control Technology in Coke Furnace's Heating System;
焦炉加热优化串级调控技术的研究及应用
7.
Multivariable Hybrid Intelligent Optimal Control for Coke Oven Heating Process
焦炉加热过程的混合智能优化控制研究
8.
Formation mechanism and control of NO_X during coke oven heating and combustion
焦炉加热燃烧时氮氧化物的形成机理及控制
9.
The Reasons of Problems from Furnace in Delayed Coking Unit for Long Period Operation
影响延迟焦化装置加热炉长周期运行的因素
10.
Selection of furnace firebricks for large delayed coking unit
大型延迟焦化装置加热炉耐火砖的选用
11.
METALLOGRAPHICAL EXAMINATION OF DELAYED COKER FURNACE TUBE AFTER LONG TERM OPERATION
延迟焦化长期运行后加热炉炉管材质的金相检验
12.
Application of BFG Heating Intelligent System on Coke Oven
高炉煤气加热智能系统在焦炉的应用
13.
Brief Talk on Influence of BF Gas Heating on Coke Oven Production
浅议高炉煤气加热对焦炉生产的影响
14.
Carbonisation is the thermal process for the conversion of coal into coke, involving heating coal at high temperature for many hours in the absence of air whilst contained in ovens.
焦化作用是将煤转化为焦炭的热处理过程,涉及到将煤在焦炭炉中隔绝空气高温加热数小时。
15.
Model Development of Temperature for Heating Fire Way in Coke Stove and Control of Coke Stove;
焦炉加热火道温度模型的建立及焦炉控制研究
16.
Thermal efficiency calculation on CFB boiler of petro-coke and desulfurizer addictive coal combustion
燃用石油焦和煤添加脱硫剂循环流化床锅炉热效率计算
17.
Features of Baosteel's Electrically-heated 300 kg Pilot Coke Oven
宝钢300kg电加热试验焦炉特性
18.
Heat transfer coefficient of additional heating surface in CDQ waste-heat boiler
干熄焦余热锅炉中附加受热面传热系数的研究