说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 句库 -> 小焦炉
1.
Analysis on Relationship Between Coking Time and Coke Quality
结焦时间与焦炭质量关系的20kg小焦炉实验分析
2.
Analysis on Impact Factors of Coke Ratio in Blast Furnace Using Partial Least Squares Regressive Model
基于偏最小二乘回归的高炉焦比影响因素分析
3.
coke oven plant
炼焦炉工厂,焦化厂
4.
mixed coke oven and blast furnace gas
焦炉与高炉混合煤气
5.
Carbonisation is the thermal process for the conversion of coal into coke, involving heating coal at high temperature for many hours in the absence of air whilst contained in ovens.
焦化作用是将煤转化为焦炭的热处理过程,涉及到将煤在焦炭炉中隔绝空气高温加热数小时。
6.
Installation of the Transformation from Single Thermal Coke Oven to Complex Thermal
单热式焦炉改复热式焦炉的工程安装
7.
PRACTICE OF SHI STEEL IN BLAST FURNACE PRODUCTION-STOPING AND REPRODUCING WITH FULL COKE
石钢高炉停炉及全焦开炉的探索实践
8.
Using the pelletized sinter as BF charge, obvious effect in BF productivity increase and coke saving was sained.
高炉使用小球烧结矿后,增产节焦的效果十分显著。
9.
I found a likeness of Miss Dartle looking eagerly at me from above the chimney-piece.
我看到壁炉搁板上面达特小姐的画像,正焦灼急切地看着我。
10.
Introduces a method of arranging discharging plan of coke ovens on the same line.
介绍了一种多座焦炉同在一条熄焦线上的焦炉出炉计划编排方法。
11.
lurgi low temperature carbonization oven
鲁奇的低温焦化烘炉
12.
A DISCUSSION ON COKE DEPOSITION IN FURNACE TUBES OF DELAYED COKING UNIT
延迟焦化加热炉炉管内结焦问题的探讨
13.
Model Development of Temperature for Heating Fire Way in Coke Stove and Control of Coke Stove;
焦炉加热火道温度模型的建立及焦炉控制研究
14.
Selection of Processes for Desulfurization and Decyanation of Coke Oven Gas
焦化厂焦炉煤气脱硫脱氰工艺的选择
15.
THE TEST OF ORE-COKE MIXED CHARGING AND THE ANALYSIS OF COKE-SAVING MECHANISM IN BLAST FURNACE
高炉矿焦混装试验及其节焦机理分析
16.
Compatibility adjustment of pushing cars used in the 5th and 6th coke ovens
5~#、6~#焦炉推焦车互换性调整
17.
6 Meters Coke Side of Coke Oven Gas Shortage of the Removal of Export System
6m焦炉焦侧荒煤气导出系统的拆除
18.
The Application of New Technology on No.5、6 Coke Oven of Xuanhua Steel Coking Plant
宣钢焦化厂五、六号焦炉新技术应用