1.
tificial recharge
人工补给;人工补给地下水;人工补水;人工灌注;回灌
2.
Key Points in Construction Management of Manual Holing Pouring Pile
人工挖孔混凝土灌注桩施工管理要点
3.
The safety technologies of the hole of manually dig cast-in-place pile
浅谈人工挖孔灌注桩成孔的安全技术
4.
Post Grouting for Hand Dug Piles with the Pipe Driven at the Pile End
人工挖孔灌注桩桩底打管后注浆技术及应用
5.
Application of Hand-dug Piles Technology in Construction
人工挖孔灌注桩施工技术在建筑工程中的应用
6.
Construction of manual digging concrete pile in dormitory building works of the grade one pumping station located in the main canal transferring of Yellow River diversion project
引黄总干一级泵站宿舍楼人工挖孔灌注桩施工
7.
The analysis of the elementary construction of the human excavating cast-in-place piles and the quality acceptance
人工挖孔灌注桩基础施工及质量验收要点简析
8.
The Effect of Groundwater on Manual Dig Concrete Pile
地下水对人工挖孔灌注桩的影响与处理
9.
Discussion on Some Interrelated Problems of Static Load Experiment of the Manual Bore Cast-in-place Pile
人工挖孔灌注桩静载试验有关问题的探讨
10.
The Benefit Comparison Between Oust- in- site Pile of Manpower Boring and Driven Precast Pile;
人工挖孔灌注桩与锤击预制桩的效益比较
11.
Construction Technology of Manual Holing Boring Piles with Manual Expanding Bottom Constructed with Long Spiral Drilling Machine in Wuhan Tianhe Airport Terminal
武汉天河机场航站楼长螺旋钻机成孔人工扩底灌注桩施工技术
12.
Analysis on Applying Post-grouting Technique in Bored Pile
后注浆钻孔灌注桩的工程实例与探讨
13.
The application of post-injecting method in bored pile engineering
后注浆法在钻孔灌注桩工程中的应用
14.
Construction Technology of Mechanical Impact Pore-forming in the Project of Pouring Pile Foundation
灌注桩基工程机械冲击成孔施工工艺
15.
Protect Role of Artificial Synthesized E-selectin in Rat Cerebral Ischemia-reperfusion Injury;
人工合成E-选择素对大鼠脑缺血再灌注损伤保护作用的实验研究
16.
The Protective Effects of Cordyceps Extract on Acute Renal Ischemia Reperfusion Injury in Rats
人工虫草复合液对大鼠肾缺血再灌注损伤保护作用研究
17.
Expression of MMP-9 after Cerebral Ischemic Reperfusion and the Effects of Artificial Synthetic E-selectin in Rats
大鼠脑缺血再灌注后MMP-9的表达及人工合成E-选择素的干预作用
18.
Technics and Quality Control of the Cast-in-place Bored Pile;
浅谈钻孔灌注桩施工工艺及质量控制