1.
Research on Dong Fang Steam Turbine Works s Incentive Programme;
东方汽轮机厂生产单元激励模式研究
2.
Study on Vender Evaluation Methods of HTC
哈尔滨汽轮机厂供应商评价方法的研究
3.
Tactics Study on the Team-building of Technical Workers of Dong Fang Steam Turbine Works;
东方汽轮机厂技术工人队伍建设的策略研究
4.
To Enhance Dfstw s Core-Competence by Value-Chain Analyzing;
运用价值链分析提升东方汽轮机厂核心竞争力
5.
Studies on the Actualization Course of Production Outsourcing of Dong Fang Steamer Turbine Works;
东方汽轮机厂生产业务外包实施过程研究
6.
Study of International Operation Problems for DFSTW;
东方汽轮机厂国际化经营若干问题研究
7.
Enterprise Resource Planning Implementation in Dongfang Steam Turbine Works;
东方汽轮机厂实施ERP若干问题的研究与思考
8.
Research on Exchange Action of Economic Development of DFSTW and Mianzhu City;
东方汽轮机厂与绵竹经济发展互动研究
9.
Vapor Seal Transformation for 300MW Steam Turbines in Zhanjiang Power Plant
湛江电厂300MW汽轮机汽封改造
10.
Quality criteria of turbine oils in service for power plants
GB7596-1987电厂用运行中汽轮机油质量标准
11.
Optimized Start-up and Shutdown for Turbine With 100MW in Wulashan power plant;
乌拉山电厂100MW汽轮机优化启动
12.
Vibration Analysis and Control of the Turbine Unit
某电厂25MW汽轮机组振动分析与控制
13.
OPTIMIZATION ANALYSIS ABOUT TUBRO-GENERATOR FOUNDATION OF JINGGANGSHAN ELECTRIC PLANT
井冈山电厂汽轮发电机基础优化分析
14.
Measures to Realize Operation of 25 MW Turbine Generator in an Isolated Power Plant
25MW汽轮发电机实现孤厂运行的措施
15.
Reconstructure of 200MW Air-cooled Steam Turbine in a Combined Heat Power Plant(CHP)
某热电厂空冷200MW汽轮机改造
16.
Static Characteristic of Steam Valves of No.2 Turbine for Zhuhai Power Station
珠海发电厂2号汽轮机汽门的静态特性
17.
MODIFICATION OF DRAIN MODE IN HIGH-PRESSURE STEAM CONDUCTING PIPE TO STEAM TURBINES OF QINSHAN NUCLEAR POWER PLANT NO.3
秦山第三核电厂汽轮机高压导汽管疏水改进
18.
Retrofit of Steam Sealing for Domestic 200 MW Steam Turbine Huaibei Power Plant
淮北电厂200 MW汽轮机汽封系统技术改造