1.
Analysis on a Failure of Which A Donkey Boiler's Furnace Wall Still "Red" after Shutdown
“Gold light”轮辅锅炉停炉后炉膛内壁“发红”故障分析
2.
a tank or pipes set at the back of a fireplace or in the firebox of a stove.
在壁炉或火炉后部的罐或管。
3.
Control on Drum Wall Temperature Difference of Natural Circulation Boilers after Shutdown
自然循环锅炉停炉后汽包壁温差的控制
4.
Maintenance Practice at the Later Stage of Campaign of Masteel's 2500~3 BF
马钢2500m~3高炉炉役后期护炉实践
5.
Practice of Furnace Protection in Anaphase of No.1 2500 m~3 BF of Masteel
马钢2500m~3高炉炉役后期护炉保产技术实践
6.
Flow Characteristics in CWM-fired Chamber Retrofitted from Travelling Grate Boiler
链条炉排锅炉改燃水煤浆后炉内气流特性研究
7.
FURNACE MAINTENANCE AND PRACTICE FOR LATER STAGE OF WORKING LIFE OF 2000m~3 BLAST FURNACE OF HAN STEEL
邯钢2000m~3高炉炉役后期的炉体维护与操作实践
8.
Air tightness test for auxiliary boiler (economize boiler) on board.
辅锅炉(废气锅炉)装船后气密试验。
9.
large log at the back of a hearth fire.
在壁炉里放在炉火后部的大圆木。
10.
CONTROL OF FURNACE CHAMBER RESISTANCE OF ACHESON FURNACE IN LATER STAGE OF GRA PHITIZATION
艾奇逊炉石墨化后期炉内电阻的控制
11.
Maintenance of 150t Converter Linling in the Middle-late Period at Angng
安钢150t转炉中后期炉衬的维护实践
12.
Then he hurried home to light the stove.
然后,他赶回家去生炉子。
13.
The converter is tipped on to its side.
把转炉向一侧倾转后。
14.
White-hot liquid iron is run off through the tapping hole and then is taken to the converter, open-hearth furnace or electric furnace to be made pure.
炽热的铁水从出铁口流出,然后被送到转炉,平炉或电炉提纯。
15.
When the circumference of the large bell is loaded by the small bell, the large bell is opened and the stock is dropped into the furnace.
大料钟的圆周都装上炉料后,大料钟降下,炉料便装入炉内。
16.
After 1870 the Siemens regenerative gas furnace replaced the coke-fired furnace.
1870年后,西门子用蓄热式煤气炉代替焦炭炉。
17.
Static and Buckling Analysis on the Manhole Made Shell of No.1 BF by Finite Element Method
1号高炉炉壳开孔后的有限元静力和屈曲分析
18.
Technological Progress and Tapping Management in Modified No.5 BF of BX STEEL
本钢5号高炉改造后炉前技术进步和出铁管理