1.
Synthetic phenol for industrial use--Determination of solidification-point after drying
GB/T2964-1982工业合成苯酚干燥后凝固点测定
2.
After seven days, the grouted mortar will have concreted, then we shall tighten the anchor bolts.
灌浆在七天以后凝固,我们就将拧紧地脚螺栓。
3.
The cement will set in a few hours.
水泥几小时后就会凝固。
4.
coagulum, coagulm
凝结物,凝块(胶体溶液凝固后所得凝集块状物)
5.
The mixture of Putty and Hardener should be used up before gelling.
原子灰与固化剂混合后,要在凝固前使用完毕。
6.
Rat blood coagulation time was significantly prolonged.
大鼠用药后血液凝固时间显著延长。
7.
Experimental Study on the Shear Capacity of Post-installed Anchor Group in Concrete Structures;
混凝土结构后锚固群锚抗剪试验研究
8.
Test and reinforcement of the reinforced concrete structure after fire
钢筋混凝土结构火灾后的检测与加固
9.
Application of Nisin for avoiding postacidification of solidification yoghourt
Nisin在凝固型酸奶后酸化控制中的应用
10.
The rock formed by the cooling and solidifying of molten rock.
熔岩融化的岩石冷却凝固后形成的岩石
11.
A body of igneous rock formed beneath the surface of the earth by consolidation of magma.
火成岩岩浆凝固后在地表下形成的火成岩岩体
12.
The solidifying streams are gathered into a single strand and wound onto a spool.
这些液流凝固后被集为一股,绕上一个线轴。
13.
After setting, the surfaces of the specimens are ground down using carborundum and alumina.
凝固之后,样品表面连续用金钢砂或氧化铝磨平。
14.
Reliability-based Assessment of Reinforced Concrete Bridges in Commission and Strengthened Condition;
服役期及加固后的钢筋混凝土桥梁可靠性研究
15.
Study on Pre_Processing and Post-processing Software Used for Solidification Simulation of Double-metal Composite Pipe Made by Centrifuge Casting;
离心铸造双金属复合管凝固模拟前后处理研究
16.
Pre-processing and Post-processing Technologies for Numerical Simulation of Mold Filling and Solidification of Castings;
铸件充型凝固过程数值模拟前后处理技术研究
17.
Design Method of Anchorage Zones in Post-Tensioned Prestressed Concrete;
后张预应力混凝土锚固区设计方法研究
18.
Analysis of Bearing Capacity of Right Section of Strengthened Reinforced Concrete Beam after the Fire Hazard;
火灾后加固的钢筋混凝土梁正截面承载力研究