说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 句库 -> 长堤
1.
It was he, people say, that had the causeway Bai'Ti built.
据说,他在湖的北部筑起了长堤,即现在的白堤。
2.
Cars can now be driven direct to Sentosa by a causeway.
汽车现在可以通过一条长堤,直接进入圣淘沙。
3.
Situated just off the northeast coast of Italy, it is linked to the mainland by a long causeway.
它位于意大利东北岸外,有一长堤道与本土相连。
4.
alysis on oil-gas reservoir-forming rule in Changdi buried -hill drape structural belt.
长堤潜山披覆构造带油气成藏规律分析
5.
Discussion on hydrocarbon?bearing possibility in east flank of drape structural zones of Changdi buried hill.
关于长堤潜山披覆构造带东翼含油气性的讨论
6.
Analysis of monitoring results for seepage in foundation of?Anqing section of Changjiang dike
安庆长江江堤堤基及堤后渗流监测成果分析
7.
Bid invitation practice for concealed works of important dyke along the Yangtze river
长江重要堤防隐蔽工程招标工作实践
8.
Study on the Benefit of Siltation Minimization of Extending the Breakwaters of Tianjin Port
天津新港延长防波堤的减淤效益研究
9.
The two land bodies are connected by a long, narrow causeway.
这两片土地由一条狭长的堤道相连接。
10.
Numerical modeling of tidal current in Chiwan sea area after the project of extended jetty
赤湾突堤延长工程潮流数学模型研究
11.
The bagged sand core sloping dike structure and its design method in the Yangtze Estuary Deepwater Channel Regulation Project
介绍长江口航道治理工程中袋装砂堤心斜坡堤结构及设计方法。
12.
Bagged Sand Core Sloping Dike Structure and Its Design Method in Yangtze Estuary Deepwater Channel Regulation Project
长江口深水航道治理工程中袋装砂堤心斜坡堤结构设计
13.
Deepened Reform of Levee Construction System --Study on Levee Construction along the Yangtze River;
堤防工程建设体制的深刻变革——对长江堤防工程建设的认识和思考
14.
Design of the Sloping-Faced North Leading Dike With Bagged-Sand Core for the Yangtze Estuary Deepwater Channel Regulation PhaseⅠProject
长江口深水航道治理工程一期工程北导堤袋装砂堤心斜坡堤的设计
15.
The design and construction of the sloping- faced north leading dike with bagged- sand core for the 1st phase of the Yangtze Estuary deepwater channel regulation project are introduced.
介绍长江口深水航道治理一期工程北导堤袋装砂堤心斜坡堤的设计与施工。
16.
They constructed 15km. of dykes[14 new reservoirs].
他们修建15公里长的堤坝[十四座新水库]。
17.
Study on the Computer Simulation System for failure Process of Yangtze River Embankment
长江堤岸失稳过程计算机仿真系统研究
18.
The gravel characteristics and dynamic environments of the Great Wall Bay coast, Antarctica
南极长城湾滨岸砾石堤特征及动力环境