1.
Disconnect test leads from relay cavities immediately after testing.
测试后立即从继电器上拆卸测试导线。
2.
rail bond resistance tester
钢轨导接线电阻测试器
3.
The tester measures the capacitance between the plate and each lead of the circuit under test.
测试设备测量金属板和受测电路的每一条导线。
4.
The switch wire harness must be disconnected before testing switch continuity.
在测试导通性之前必须断开开关线束。
5.
Design of Missile Dynamic Measurement System Based on VXI Bus
基于VXI总线的导弹动态测试系统设计
6.
Wires running from the tester interface to the probes carry test signals back and forth.
连接测试设备和探针的导线来回的传递测试信号。
7.
Test procedures for semiconductor X-ray energy spectrometers
GB/T11685-1989半导体x射线能谱仪的测试方法
8.
Testing Methods of Power Leads Conducted Emissions of Ship Equipments Working in High Current
船用大电流设备电源线传导发射测试方法研究
9.
Automation test technology in software defined ratio navigation receiver
软件无线电导航接收机自动测试技术研究
10.
HTS STACKS SODERING TECHNIQUE AND PERFORMANCE TEST FOR ITER CURRENT LEADS
ITER电流引线高温超导叠制作工艺及性能测试
11.
Sea-to-air Missile Automatic Test System Design Based on VXIBus and GPIBBus
基于混合总线的舰空导弹自动测试系统
12.
Test for correct orientation of the active and neutral wires and the pins of the mains by continuity testing with an ohmmeter.
利用欧姆表,通过连续性试验来测定有效导线、中性线和干线的插脚引线的定位是否正确。
13.
EDM-height traversing
电子测距高程导线测量
14.
This first segment would simply test the superconducting components, using liquid nitrogen to cool them.
第一条线路纯粹是为了测试超导体元件,以液态氮冷却。
15.
System capacitive current testing can guide arc-extinguish coil correct switching.
通过测试系统电容电流,可以指导消弧线圈的正确投切。
16.
The Development of Discrete Semiconductor Testing System with CPLD Simulated System Bus;
基于CPLD模拟系统总线的半导体分立器件测试系统开发
17.
Measurement of the Surface Impedance of the High Temperature Superconducting Thin Films with Coplanar Transmission Line
基于共面传输线法的高温超导薄膜表面电阻的测试研究
18.
Multifunctional Test System-LISN Used for Conducted Interference Test
用于传导干扰测试的多功能线性阻抗稳定网络(LISN)的研究与设计