1.
Strengthening construction procedure control to increase pass rate for the installation of lightweight partition board
强化工序控制 提高轻质隔墙板安装合格率
2.
Check interrelated system and equipments have been installed, and checked eligibility.
检查相关的系统及设备已安装完毕,并检验合格。
3.
Be in Bad order
破损,(包装)不合格
4.
Setup has searched the specified directory but cannot find any of the qualifying products.
安装程序搜寻了指定的目录,但未找到任何合格产品。
5.
For those passing the inspections, a Certification of Entry Inspection and Quarantine of Goods will be issued, and the approval extended for their sales, installation and use.
经检验合格的,出具《入境货物检验检疫证明》,准予销售、安装、使用。
6.
The system referred above has been installed / tested / verified for acceptance(Please attach the main qualified technical specification ).
上述系统已安装/测试/通过验收(请另附上验收合格的主要技术指标).
7.
Setup failed to locate a valid qualifying product on your machine. Please select the drive where a qualifying product can be found.
安装程序无法在您的机器上找到有效的合格产品。请选择可找到合格产品的驱动器。
8.
A fitting together of parts, as those in a machine.
装配规格构件的装配,如安装于机器上的
9.
approved storage facility
合格的爆炸物贮存装置
10.
Anti-Burglar Door & Aluminum Alloy installation Team
防盗门铝合金安装队
11.
Install screws in track assembly.
在轨道组合中安装螺钉。
12.
Manage and supervise the instrument installation contractor and in accordance with the contract scope specifications standards and construction drawings.
管理和监督设备安装承包方的工作,并确保其符合承包合同规定的范围,规格,标准和建筑制图。
13.
safety approval plate [container]
安全合格牌照〔货柜〕
14.
certificate of safety compliance
符合安全规格证明书
15.
Combined of packing list is not acceptable.
提供装箱单不能是联合格式的装箱单。
16.
Unrecognized format... using installed player
不可是别的格式... 使用已安装的播放器
17.
"An installation package for the product [2] cannot be found. Try the installation again using a valid copy of the installation package '[3]'.
"找不到产品 [2] 的安装包。请使用安装包 '[3]' 的合法副本,试着重新安装。
18.
Seller shall provide the System in accordance with the Product Description and Specifications and Delivery and Installation Timetable incorporated herein and
卖方根据作为本合同一部分的产品说明和规格及交货和安装时间表提供系统