1.
The Construction Method Proposal Study on the Excavation and Supporting & Protection Works for Powerhouse of Liuhong Hydropower Station;
柳洪电站主副厂房开挖与支护施工方案研究
2.
Came 1975 1980 Jilin paper mill change appoint vice director, can assistant factory director, chief engineer.
1975年至1980年吉林造纸厂革委会副主任、副厂长、总工程师。
3.
Application of PKPM software in auxiliary powerhouse design for Baise Multipurpose Dam Project
百色水利枢纽副厂房设计PKPM软件应用探讨
4.
Safety assessment of the third subsidiary power house at Fengtan power station
凤滩电站三副厂房结构安全检测与评估
5.
Technical specification for load design of main building in fossil fuel power plants
火力发电厂主厂房载荷设计技术规程
6.
Seismic Analysis of Frame Structure for the Central Workshop of Fangsheng Electric Power Plant;
方盛电厂主厂房框排架结构抗震分析
7.
The Application of VE in Design of Power Plant Main Building;
价值工程在电厂主厂房设计中的应用
8.
Analysis of problems of pile foundation of main power building in Chizhou Power Plant and their treatment
池州电厂主厂房桩基问题分析及处理
9.
These sufferers hated the manufacturers who owned those buildings.
这些受苦人仇恨那些拥有这种厂房的厂主。
10.
Application of Foam Polyurethane in Seal of Main Power Houses of Power Plant
泡沫聚氨脂在电厂主厂房封闭中的应用
11.
Development of the Software for Design of the Framed BentStructures of Main Workshop Buildings in Thermal Power Plants
火电厂主厂房框排架结构设计软件的研制
12.
An Analysis of the Aseismic Performance of the Service Main Building Structure in the Large-scale Thermal Power Plant;
大型火力发电厂服役主厂房结构抗震性能研究
13.
Analysis of Dynamic Response of Bent Structure of the Main Powerhouse in Fengman Hydroelectric Power Station;
丰满发电厂主厂房排架结构动力响应分析
14.
Rebuild Main Workshop Building for 180m~2 Sintering Machine of No.1 Sintering Workshop in Iron-making Plant
包钢炼铁厂一烧车间180m~2烧结机主厂房改造
15.
Experience in applying grid structure to main building roof for power plant
网架结构在发电厂主厂房屋面中应用的经验
16.
Application and development of architecture 3D design of main power building construction for thermal power plants
火电厂主厂房建筑三维设计应用与开发
17.
Optimization of Water Spray Extinguishing System for Oil Tank in the Main Factory Building of Thermal Power Plant
火力发电厂主厂房油箱水喷雾灭火系统的优化
18.
FEM Analysis of the Frame-Shear Wall Structure of Main Workshop Building of Large Capacity Power Plant
大型火电厂主厂房框架-剪力墙结构有限元分析