1.
Numerical Simulation and Experimental Research of Spiral Flow Ventilation in the Mechanized Heading Face;
机掘工作面旋流通风数值模拟及实验研究
2.
Mechanism Analysis of High Pressure Spray Dustfall in Heading Face
掘进工作面高压喷雾降尘的机理分析
3.
Application of Loading Machinery and Ancillary Equipment on Coal (Rock) and Gas Outburst Excavating Face
高突掘进工作面装载机械及配套设备的应用
4.
Application of Double Fans and Dual "Sanzhuan" Power Supply Loops at Heating Face
双风机“双三专”电源在掘进工作面的应用
5.
Applying Continuous Mining Machine to Driving Mining Roadways in Fault Broken Zone
应用连采机在断层破碎带中掘进工作面巷道
6.
Prediction model of support vector machine for gas emission quantity of fully mechanized roadway driving face
综掘工作面瓦斯涌出量的支持向量机预测模型
7.
The main task of hydraulic excavator is to dig soil.
挖掘机的主要工作就是土壤的挖掘。
8.
Side-slip Analysis of Disc Cutter on All Kinds of Cutterheads ofFull Face Rock Tunnel Boring Machine
掘进机不同刀盘面上盘形滚刀工作时的侧滑分析
9.
Parametric Design of the Working Equipments of the Hydraulic Excavator for Assembly Environment;
面向装配环境的液压挖掘机工作装置参数化设计
10.
Study on the Monitoring and Control System of Multi-local Fans of the Heading Face Based on DH+ Bus;
基于DH+总线的掘进工作面多局部通风机监测监控系统的研究
11.
Study on the Mechanism and Technology of Advanced Detection with Transient Electromagnetic Method for Roadway Drivage Face;
巷道掘进工作面瞬变电磁超前探测机理与技术研究
12.
Several Measures to Realize Quick Driving at Outburst Prevention Heading Faces
防突掘进工作面实现快速掘进的几点措施
13.
The miners worked at the face for 5hours.
矿工在采掘面上工作了5小时。
14.
The miners worked at the face eight hours a day.
矿工们在采掘面上每天工作八小时。
15.
The miner work at the face eight hour a day
矿工们在采掘面上每天工作八小时
16.
Simulation and Analysis about Working Characteristic of Loading Mechanism in Excavating Machine;
掘进机装载机构工作特性的模拟研究
17.
There are mainly two kinds of roadheader: Tunnelling Boom Machine(TBM) and partial-size tunneling machine.
掘进机按照对于巷道断面的作用方式可划分为两种:全断面掘进机和部分断面掘进机。
18.
Research on Gas Emission Law in Coal Road Heading Face of Driving;
煤巷掘进工作面瓦斯涌出规律的研究