1.
Down Disassembly of H3/36B Tower Crane by Self-Made Lifting Beam in Power Construction
电力建设中H3/36B塔吊自制吊梁的降节拆卸
2.
Self-made hanging beam dismantling H3/36B tower crane
自制吊梁拆卸H3/36B塔式起重机
3.
The lift technology of prefabricated box beam spanned railway with large tonnage vehicle lift
大吨位汽车吊跨铁路预制箱梁吊装技术
4.
STEEL BOX BEAM INTEGRAL ERECTION MAKE USE OF TRANSFORMING SUSPEND-BASKET FORMING BOMMS
利用挂篮改制成的吊梁实现钢箱梁整体安装
5.
Construction Control Research of the Hoisting Steel Trussed Girder of Suspension Bridge
悬索桥钢桁加劲梁吊装施工控制研究
6.
Construction control of Huai'an Beijinglu Bridge
淮安北京路大桥钢箱梁吊装线形控制
7.
Breast Frame Lifting Technology for Self-anchored Suspension Bridge
自锚式悬索桥钢箱梁膺架吊装施工技术
8.
Dynamic characteristics for self-anchored cable-stayed suspension bridges
自锚式斜拉-悬吊协作体系桥梁动力性能
9.
Study on Fatigue Reliability and Safety Control of Steel Structure Crane in Service;
在役钢结构吊车梁疲劳可靠性与安全控制研究
10.
Construction Control of Long Span Suspension Bridges During Erecting Stiffening Girders
大跨悬索桥加劲梁吊装阶段的施工控制
11.
Manufacturing Technique of Super-large Crane Beam for TISC 3,500 mm Plate Rolling Mill
天钢3500mm中厚板工程超大型吊车梁制作技术
12.
Design of Power Assist Jib Crane and Research on Material Automatic Lifting Control System;
助力吊设计及物料自动提升控制研究
13.
The Construction Control Research on Hangers Installation of Self-anchored Suspension Bridges;
自锚式悬索桥吊索安装施工控制研究
14.
Research on hanger installation analysis and construction management for self-anchored suspension bridge
自锚式悬索桥吊索张拉施工控制分析
15.
Remove bolts holding front of suspension crossmember to frame rails under upper control arms.
卸下将悬吊横梁前部紧固到上控制臂下面的框架轨道的螺栓。
16.
Install bolts holding front of suspension crossmember to frame rails under upper control arm.
安装将悬吊横梁前部紧固到上控制臂下面的框架轨道的螺栓。
17.
Study and Application of Fabricating and Lifting Segment by Segment Technology for Large Span Steel Box Beam;
大跨度钢箱梁的制作与分段吊装技术研究与应用
18.
single-beam electric hook crane