说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 句库 -> 二滩电站
1.
Three-dimensional FEM Analysis and Back Analysis for Deformation Monitoring of Ertan Hydropower Station Chambers
二滩电站坝肩厂房三维有限元分析及围岩变形观测反分析
2.
Ertan hydropower station is the first power station built on Yalong River.
二滩水电站是雅砻江梯级开发的第一个水电站。
3.
SEISMIC HAZARD ANALYSIS OF THE ERTAN DAM SITE
二滩水电站坝区场地地震危险性分析
4.
Appraisal on Supervision Work of Arch Dam Works of Ertan Hydropower Project;
二滩水电站拱坝工程监理工作后评估
5.
Performance of International Procurement Contract for Electrical and Mechanical Equipment at Ertan Hydropower Station;
二滩水电站机电设备国际采购合同的执行
6.
ESTIMATION OF STRONG GROUND MOTION FOR THE ERTAN DAM REGION
对二滩水电站坝区场地地面运动的估计
7.
Supervision on Installations of Gates and Hoists in te Bid Ⅱ Project at the Ertan Hydropower
二滩水电站Ⅱ标工程闸门与启闭机的安装监理
8.
Mid-Long Runoff Intelligent Forecasting System of Ertan Power Station;
二滩水电站中长期入库径流智能预测系统
9.
Practice and Consideration of Ertan Hydropower Station Construction Project Management;
二滩水电站建设项目管理的实践与思考
10.
Field test on heat and humidity of underground transformer conveyance tunnel in a hydropower station
二滩水电站交通洞引风热湿交换特性现场测试
11.
Study on the runoff description and optimal operation models for Ertan hydropower station
二滩水电站水库径流描述与优化调度模型研究
12.
Summarization on the design of 6.3/0.4kV drainage transformer substation on plunge-pool at Ertan Hydropower Station
二滩水电站水垫塘6.3/0.4kV排水工程设计综述
13.
Static electric field of 550kV circuit breaker in GIS of extension project at Ertan hydropower station
基于二滩水电站550kV扩建工程GIS断路器静电场分布
14.
Study on Dynamic Response Characteristics and Safety Monitoring Indexes of Apron Slabs in Plunge Pool of Ertan Hydropower Station;
二滩水电站水垫塘底板动力响应特性与安全监测指标研究
15.
Study on Medium and Long Term Runoff Forecasting and Implicit Stochastic Optimal Operation Model for Ertan Hydropower Station;
二滩水电站中长期径流预报及隐随机优化调度模型研究
16.
In this paper, the material, structural properties and the site fabricating technology of stainless steel split runner for Ertan power plant were introduced.
本文介绍了二滩水电站不锈钢分瓣转轮的材料、构性能和现场组焊工艺技术。
17.
Geomechanical Model Test and Finite Element Analysis of Rock Abutment Stability--Stability Analysis of Right Abutment of Ertan Arch Dam
基岩稳定的地质力学模型试验与有限元分析——二滩水电站右坝肩稳定分析
18.
Study on the Temperature Field of Ertan Arch Dam in the First Impounding Period and Its Effect on the Structure of the Dam;
二滩水电站初期蓄水拱坝温度场及对大坝结构特性作用与影响研究