1.
The Leaking Reason Analysis and Treatment Method of Ditch in the Underground Cable;
地下电缆沟道漏水原因分析及处理方法
2.
Design of the Monitor System for Cable Trench Based on ARM and CANBus
基于ARM和CAN总线的电缆沟道监测系统设计
3.
Optimization of Connection Rebar between Secondary Lining and Cable Duct in Highway Tunnels
公路隧道二次衬砌和电缆沟间连接钢筋的改进
4.
Design of CAN bus power cable trench monitoring system based on ARM
基于ARM的CAN总线电缆沟道监测系统的设计
5.
Aluminum conductor XLPE insulated low-smoke and non-halo sheathed Flame-retardant power cable.
室内、隧道及电缆沟等不能承受机械外力的场所。单芯电缆不允许敷设在磁性管道中。
6.
For laying in doors、intunnels and in cable trench, able to berar external mechanical forces, but unale to bear large pulling force.
室内、隧道、电缆沟等能承受机械外力的场所,但不能承受大的压力。
7.
For laying indoors, in tunnel, cable french, well or direct in ground, able to bear external mechanical for ces and certain pulling force.
室内、隧道、电缆沟、竖井或埋地敷设等,能承受机械外力和一定的拉力。
8.
Aluminum conductor XLPE insulated fine steel wire armored low-smoke and non-halo sheathed Flame-retardant power cable.
室内、隧道、电缆沟、竖井等能承受机械外力和一定拉力的场所。
9.
For laying indoors, in trenches,in ducts and down well, able tobear heavier pulling force, andfor fixed installation.
敷设在室内、电缆沟、管道、竖井等能承受较大机械拉力等固定场合。
10.
For laying indoors,in trenchesin ducts and in ground,able tobear heavier pulling force,andfor fixed installation.
敷设在室内、电缆沟、管道、直埋等能承受较大机械外力等固定场合。
11.
Design and Implemention of the Front-End System for Cable Draw Pit Comprehensive On-Line Detection Platform
电缆沟井在线综合测控平台下位机系统的设计与实现
12.
For laying indoors、in tunnel, cable trench, or direct in ground, able to bear external mechanical forces, but unable to bear large pulling force.
室内、隧道、电缆沟内或埋地敷设等,能承受一定的机械外力,但不能承受大的拉力。
13.
For laying in doors, in tunnels, in cable trench or direct in ground, able to bear external mechanical forces, but unable to bear large pulling force.
室内、隧道、电缆沟内或埋地等能承受机械外力的场所,但不能承受大的拉力。
14.
A tube or duct for enclosing electric wires or cable.
线管包裹电线或电缆的管子或沟道
15.
Analysis of the Causes of Cable Well (Trench) Water Intake and Preventive Measures
电缆井(沟)进水原因分析与预防措施
16.
On the Development of Cable Industrial Cluster in Gao-gou;
安徽高沟电缆业集群发展的个案研究
17.
Analyse the Actuality and Investigate the Polity of the Cable Industry Cluster in Gaogou
高沟电缆产业集群现状分析及对策研究
18.
Construction technology control point of the cable crane in Shenxigou hydropower station
深溪沟水电站缆索起重机施工技术控制要点