说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 句库 -> 约旦AMCP水泥项目
1.
Establishment of Jordan AMCP Cement Project Schedule Plan and Analysis of Influencing Factors on Schedule;
约旦AMCP水泥项目工程进度计划的编制及工程进度影响因素分析
2.
Research of Risk Management for International EPC Cement Construction Project;
国际EPC水泥建设项目的风险管理研究
3.
Current Status and Developing Strategy of CDM Projects in Cement Industry of China
中国水泥行业CDM项目发展现状及对策
4.
EPC Project Implementation for International Cement Plants Modification
境外水泥厂改造EPC项目的执行要点
5.
Study on Power Generation by Waste Heat in Cement Branch of Yima Coal Group
义煤集团水泥公司余热发电项目研究
6.
Feasibility Analysis of Project of Cement-Making Using Acetylene-Sludge for Jinlu Group., Ltd;
金路集团电石渣制水泥项目可行性分析
7.
CDM case analysis for pure low temperature waste heat power generation of cement PC kiln;
水泥PC窑纯低温余热发电CDM项目案例分析
8.
Sub-contract Management of Design Institute Primary Contract Project in Cement Profession;
水泥行业设计院工程总承包项目分包合同管理
9.
Study on Issues in Cement Industry Environment Impact Assessment
探讨水泥行业建设项目环评需注意的几个问题
10.
The Current Situation and Countermeasures of CDMDevelopment in Cement Industry of China
我国水泥行业CDM项目的发展现状及对策
11.
Feasibility Analysis on Optimization Coal Slimes Water Concentration Filter Pressing System Project
优化煤泥水浓缩压滤系统项目的可行性分析
12.
"The king made them of liquid metal in the lowland of Jordan, in the soft earth between Succoth and Zeredah."
是在约旦平原疏割和撒利但中间借胶泥铸成的。
13.
In the plain of Jordan did the king cast them, in the clay ground between Succoth and Zeredathah.
是在约旦平原疏割和撒利但中间藉胶泥铸成的。
14.
"and when those who took up the ark came to Jordan, and the feet of the priests who took up the ark were touching the edge of the water (for the waters of Jordan are overflowing all through the time of the grain-cutting),"
他们到了约旦河,脚一入水(原来约旦河水在收割的日子涨过两岸),
15.
Chamber of Shipping Cement Charter Party
航运公会水泥运输租约
16.
Study on constrain factors in construction management of EPC project
制约EPC项目施工管理水平的若干要素探讨
17.
Technology and Case Study on Implementation of Clean Development Mechanism Project in Cement Industry;
水泥企业实施清洁发展机制项目的技术方法及案例研究
18.
Study on Project Management of Centrifugal Sludge Dewatering Equipment Packges of Chong Qing Jiang Ji Company;
重庆江机公司污泥离心脱水成套设备的项目管理研究