1.
Experimental Study on Opration Stability of Unit 2 of Shiquan Power Plant;
石泉水电厂2号机组运行稳定性问题的试验研究
2.
Optimal Study on Cooperating Operation for Hydropower Stations of Siquan and Xihe River;
石泉、喜河水电站联合优化调度研究
3.
TREATMENT OF WASTEWATER FROM LIMESTONEGYPSUM FLUE GAS DESULFURIZATION IN POWER PLANT
电厂石灰石-石膏法湿法烟气脱硫废水处理
4.
Comparison of sea water and lime stone-gypsum used as doctor treatment in flue gas desulphurization systems
火电厂石灰石-石膏法与海水法烟气脱硫的比较
5.
Advanced Treatment of Secondary Effluent by Limestone and Reuse for Power Plant
石灰石深度处理污水厂二级出水并回用于火电厂
6.
Reformation for Hot Water System by Using Waste Heat in the Gangue Power Plant
利用矸石电厂废热进行热水系统改造
7.
Primary Analysis of the Rear Slope Stability of Shimenkan Hydropower House
石门坎水电站厂房后边坡稳定性初判
8.
The spring oozes out of a rock.
泉水从岩石中渗出。
9.
Water wells from a spring beneath the rock.
水从岩石下的泉内涌出。
10.
Study on Technology of Circular Cool Water Physical Disposal in Shandong Shiliquan Power Plant;
山东十里泉发电厂125MW机组循环冷却水物理处理技术研究
11.
On optimization scheme for stone powder recovery in artificial aggregate system in some hydropower house
某水电站厂房人工砂石系统石粉回收优化方案
12.
Improvement of No.2 Generator Excitation System in Mashi Hydropower Plant
麻石水电厂2号发电机组励磁系统改造
13.
Studies on Kinematic Analysis of Rockfall at the Slopes of Switch Station Attached to Baoquan Pumped Storage Power Station;
宝泉抽水蓄能电站开关站边坡落石运动学分析研究
14.
"Who made the rock into a water-spring, and the hard stone into a fountain."
他叫磐石变为水池,叫坚石变为泉源。
15.
The Study to Corporate Culture and Management of Water and Electricity Plant of Jianghan Oil Field in Sinopec Corporation;
中国石化江汉油田水电厂企业文化与管理研究
16.
On Dangers Caused by Water Intaking Construction and Its Remediation at Xisai Power Plant
黄石西塞电厂取水施工引发的险情及整险加固
17.
hydroelectric(power) statio
水(力发)电厂[站]
18.
The calcareous and siliceous rock deposits of springs, lakes, or ground water.
泉华泉、湖或地下水中的石灰质和硅质岩石沉积物