1.
Research on the Stress Behavior of Surrounding Rock during Construction Adopting CD Method of Large Cross-section Tunnel;
大断面隧道CD法施工围岩应力行为研究
2.
Optimization of the Preparation Technology for the Derivatives of Maleis of Maleic Anhydride-β-Cyclodextrion with an Orthogoal Test
正交实验法研究MAH-β-CD衍生物的制备工艺
3.
open caisson method in underground construction
地下工程沉井法施工
4.
Studies on Extraction Technology of Volatile Oil of Radix et rhizoma asari and Process Technology of the Including Compound ofβ-CD with the Volatile Oil
细辛挥发油提取及β-CD包合工艺研究
5.
Optimization for preparation process of ivermectin enveloped with hydroxypropyl-β-cyclodextrin
伊维菌素HP-β-CD包合工艺的优化
6.
Fluorescence Study on the Interaction between Methyl Blue and Human Serum Albumin in the Presence of β-CD/HP-β-CD
荧光法研究β-CD/HP-β-CD存在时甲基蓝与人血清白蛋白的相互作用
7.
Determination of concentration of trace Cd(Ⅱ) in the mixture solution of Cd(Ⅱ) and La(Ⅲ) by the method of three wavelength photometric analysis
三波长分光光度法测定La(Ⅲ)、Cd(Ⅱ)混合溶液中痕量Cd(Ⅱ)的浓度
8.
construction survey for conventional shaft sinking method
普通凿井法施工测量
9.
alternatebay construction
(混凝土用的) 隔仓施工法
10.
Site Operations and Methods of Construction
现场作业和施工方法
11.
construction survey for special methods of shaft sinking
特殊凿井法施工测量
12.
The construction method using steel boxed cofferdam is a chief method for construction of pile caps in deep water.
钢吊箱围堰施工方法是深水承台施工中的一种主要施工方法。
13.
Hydrothermal Synthesis of Hexagonal Nanodisk of Cd(OH)_2
水热合成法制备六方形纳米盘Cd(OH)_2
14.
Construction Method and Technical Measurement of Drilling (Wash) Bore Concrete Piles
钻(冲)孔混凝土灌注桩施工方法与措施
15.
Construction Method and Technology Measure for Pipe Tacking in A Certain Power Plant in Nansha
南沙某电厂顶管施工方法及技术措施
16.
Initial analysis on measure and method of highway construction machinery management
浅谈公路施工机械管理的措施和方法
17.
The high pier construction method and control measures of highway bridge
公路桥梁高墩台施工方法及控制措施
18.
Advanced grouting process with PBA skill in Youth street
青年大街站PBA工法施工超前注浆工艺